Study of Saaremaa Master Plan (Q3068231): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Within the framework of the project, a study will be carried out to prepare the road safety and road safety scheme of the city of Kuressaare. The study will carry out a traffic census to obtain the necessary basic data, an analysis of the safety and functionality of the street network, an analysis of parking possibilities, and a conceptual traffic diagram of the city. The results of the traffic survey will be used as input for the development of...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Study of Saaremaa Master Plan

Revision as of 11:47, 16 August 2021

Project Q3068231 in Estonia
Language Label Description Also known as
English
Study of Saaremaa Master Plan
Project Q3068231 in Estonia

    Statements

    0 references
    10,000.00 Euro
    0 references
    17,760.0 Euro
    0 references
    56.31 percent
    0 references
    1 June 2019
    0 references
    1 March 2020
    0 references
    Saaremaa Vallavalitsus
    0 references
    0 references
    93819
    0 references
    Projekti raames viiakse läbi uuring Kuressaare linna liiklusohutuse ja -skeemi koostamiseks. Uuringuga viiakse läbi liiklusloendus vajalike algandmete saamiseks, tänavavõrgu ohutuse ja funktsionaalsuse analüüs, parkimisvõimaluste analüüs ning koostatakse linna põhimõtteline liiklusskeem. Liiklusuuringu tulemusi kasutatakse sisendina üldplaneeringu koostamisel. (Estonian)
    0 references
    Within the framework of the project, a study will be carried out to prepare the road safety and road safety scheme of the city of Kuressaare. The study will carry out a traffic census to obtain the necessary basic data, an analysis of the safety and functionality of the street network, an analysis of parking possibilities, and a conceptual traffic diagram of the city. The results of the traffic survey will be used as input for the development of the master plan. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.12.01.19-0094
    0 references