Construction of a two-level junction of the railway of Tallinn-Narva and Sillamäe Harbour and the reconstruction of the section of the city of Sillamäe. Step I. (Q3067973): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
Property / coordinate location
 
59°21'23.40"N, 24°37'49.04"E
Latitude59.356497020083
Longitude24.630285624161
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 59°21'23.40"N, 24°37'49.04"E / rank
 
Normal rank

Revision as of 11:45, 16 August 2021

Project Q3067973 in Estonia
Language Label Description Also known as
English
Construction of a two-level junction of the railway of Tallinn-Narva and Sillamäe Harbour and the reconstruction of the section of the city of Sillamäe. Step I.
Project Q3067973 in Estonia

    Statements

    0 references
    5,996,223.51 Euro
    0 references
    7,054,380.6 Euro
    0 references
    85.0 percent
    0 references
    1 August 2016
    0 references
    1 January 2018
    0 references
    Transpordiamet
    0 references
    0 references

    59°21'23.40"N, 24°37'49.04"E
    0 references
    10916
    0 references
    Kavandatakse järgmisi LOd parandavad lahendused: rajatakse uus 9 m laiuse kattega tee; ehitatakse välja 3 eritasandilist ristmikku autoliiklusele ning eritasandiline raudteeristmik maantee läbilaskvuse suurendamiseks; korrastatakse samatasandilised ristmikud ja mahasõidud; ehitatakse välja koguja- ja kergliiklusteede võrgustik kogu projekti alal ning jalakäijate tunnel kohaliku ja kergliikluse eraldamiseks transiitliiklusest; korrastatakse teekattemärgistus ja teeviitade süsteem. (Estonian)
    0 references
    The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.10.01.16-0031
    0 references