Q3067948 (Q3067948): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Created claim: summary (P836): 1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at criti...) |
||||||||||||||
Property / summary | |||||||||||||||
1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English) | |||||||||||||||
Property / summary: 1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English) / qualifier | |||||||||||||||
point in time: 16 August 2021
|
Revision as of 11:44, 16 August 2021
Project Q3067948 in Estonia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3067948 in Estonia |
Statements
8,500,000.00 Euro
0 references
10,000,000.0 Euro
0 references
85.0 percent
0 references
1 January 2015
0 references
31 March 2017
0 references
Transpordiamet
0 references
10916
0 references
1. Uue, I klassi laiusparameetritele ja perspektiivsele koormussagedusele vastava teekatte ehitus muutmata olemasoleva tee plaanilahendust. 2. Tee ristprofiili korrigeerimine. 3. Nelja lõigul paikneva viadukti rekonstrueerimine (kandevõime ja kõrgusgabariitide nõuetega vastavusse viimine). 4. Uute liiklusmärkide paigaldamine ja teetähistussüsteemi korrastamine. 5. 280 m müratõkkebarjääri rajamine mürauuringute aruandes selgunud kriitilistesse kohtadesse. 6. Mahasõitude korrastamine, rajatakse normidekohase laiusega bussitaskute rajamine ja sademeveesüsteemi uuendamine. (Estonian)
0 references
1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English)
16 August 2021
0 references
Identifiers
2014-2020.10.01.001.01.15-0002
0 references