Q3067948 (Q3067948): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): 1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at criti...)
Property / summary
 
1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English)
Property / summary: 1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English) / rank
 
Normal rank
Property / summary: 1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:44, 16 August 2021

Project Q3067948 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3067948 in Estonia

    Statements

    0 references
    8,500,000.00 Euro
    0 references
    10,000,000.0 Euro
    0 references
    85.0 percent
    0 references
    1 January 2015
    0 references
    31 March 2017
    0 references
    Transpordiamet
    0 references
    0 references

    59°21'23.40"N, 24°37'49.04"E
    0 references
    10916
    0 references
    1. Uue, I klassi laiusparameetritele ja perspektiivsele koormussagedusele vastava teekatte ehitus muutmata olemasoleva tee plaanilahendust. 2. Tee ristprofiili korrigeerimine. 3. Nelja lõigul paikneva viadukti rekonstrueerimine (kandevõime ja kõrgusgabariitide nõuetega vastavusse viimine). 4. Uute liiklusmärkide paigaldamine ja teetähistussüsteemi korrastamine. 5. 280 m müratõkkebarjääri rajamine mürauuringute aruandes selgunud kriitilistesse kohtadesse. 6. Mahasõitude korrastamine, rajatakse normidekohase laiusega bussitaskute rajamine ja sademeveesüsteemi uuendamine. (Estonian)
    0 references
    1. Construction of a new road surface corresponding to Class I width parameters and prospective load frequency without altering the design of the existing road. 2. Correct the cross-profile of the road. 3. Reconstruction of the four viaducts on the section (reconciliation with load capacity and height gauge requirements). 4. Installation of new road signs and restoration of the road marking system. 5. Construction of 280 m noise barrier at critical locations identified in the noise study report. 6. Refurbishment of departures, construction of bus pockets with standard widths and renewal of the rainwater system. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.10.01.001.01.15-0002
    0 references