Q3061527 (Q3061527): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: trying to import one item from austria) |
(Created claim: summary (P836): In 2018, the city of Freistadt has a city reg. Strategy drawn up in accordance with Article 7(1) of the Regulation (EU) 1301/2013. Based on this, the foot and cycle path network is expanded and measures are implemented in the municipality of Grünbach/Fr., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
In 2018, the city of Freistadt has a city reg. Strategy drawn up in accordance with Article 7(1) of the Regulation (EU) 1301/2013. Based on this, the foot and cycle path network is expanded and measures are implemented in the municipality of Grünbach/Fr. (English) | |||||||||||||||
Property / summary: In 2018, the city of Freistadt has a city reg. Strategy drawn up in accordance with Article 7(1) of the Regulation (EU) 1301/2013. Based on this, the foot and cycle path network is expanded and measures are implemented in the municipality of Grünbach/Fr. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In 2018, the city of Freistadt has a city reg. Strategy drawn up in accordance with Article 7(1) of the Regulation (EU) 1301/2013. Based on this, the foot and cycle path network is expanded and measures are implemented in the municipality of Grünbach/Fr. (English) / qualifier | |||||||||||||||
point in time: 20 July 2021
|
Revision as of 07:49, 20 July 2021
Project in Austria 1239
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Austria 1239 |
Statements
273,888.57 Euro
0 references
1 October 2019
0 references
31 October 2021
0 references
Gemeinde Grünbach/Fr.
0 references
40602
0 references
2018 hat die Stadtregion Freistadt eine Stadtreg. Strategie gem. Art. 7 Abs 1 der VO (EU) 1301/2013 erarbeitet. Darauf aufbauend wird das Fuß- u. Radwegenetz ausgebaut und Maßn. in d. Gemeinde Grünbach / Fr. umgesetzt. (German)
0 references
In 2018, the city of Freistadt has a city reg. Strategy drawn up in accordance with Article 7(1) of the Regulation (EU) 1301/2013. Based on this, the foot and cycle path network is expanded and measures are implemented in the municipality of Grünbach/Fr. (English)
20 July 2021
0 references
Identifiers
AUST-1239
0 references