Q3061072 (Q3061072): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: trying to import one item from austria)
(‎Created claim: summary (P836): A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built., translated_summary)
Property / summary
 
A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built. (English)
Property / summary: A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built. (English) / rank
 
Normal rank
Property / summary: A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built. (English) / qualifier
 
point in time: 20 July 2021
Timestamp+2021-07-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:46, 20 July 2021

Project in Austria 784
Language Label Description Also known as
English
No label defined
Project in Austria 784

    Statements

    0 references
    2,156,927.75 Euro
    0 references
    4 May 2015
    0 references
    31 August 2016
    0 references
    Josef Speckner GmbH
    0 references
    40442
    0 references
    In der neu errichteten Halle wird eine Anlage zur Erzeugung großer Paletten installiert, gleichzeitig mit der Kapazitätserweiterung werden eine weitere Trockenkammer mit Wärmerückgewinnung und ein asphaltierter Lagerplatz gebaut. (German)
    0 references
    A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built. (English)
    20 July 2021
    0 references

    Identifiers

    AUST-784
    0 references