Faralhão System – Emissary and lifting conduct for connection to Setúbal sewage treatment plant (Q2981986): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation Faralhão System is an intervention aimed at resolving one of the instances of non-compliance and litigation in the context of Daru covered by the Community infringement procedure imposed on Portugal by the European Community (Proc. 2009/2309)., translated_summary)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Setúbal / rank
 
Normal rank

Revision as of 08:36, 9 July 2021

Project Q2981986 in Portugal
Language Label Description Also known as
English
Faralhão System – Emissary and lifting conduct for connection to Setúbal sewage treatment plant
Project Q2981986 in Portugal

    Statements

    0 references
    344,623.49 Euro
    0 references
    85.0 percent
    0 references
    1 September 2015
    0 references
    30 September 2016
    0 references
    MUNICIPIO DE SETUBAL
    0 references
    0 references
    0 references

    38°29'57.44"N, 8°47'42.83"W
    0 references
    A operação “Sistema do Faralhão” trata-se de uma intervenção que visa resolver uma das uma situações de incumprimento e de contencioso no âmbito da DARU contempladas no processo de infração comunitário imposto a Portugal pela Comunidade Europeia (Proc. 2009/2309). (Portuguese)
    0 references
    The operation Faralhão System is an intervention aimed at resolving one of the instances of non-compliance and litigation in the context of Daru covered by the Community infringement procedure imposed on Portugal by the European Community (Proc. 2009/2309). (English)
    9 July 2021
    0 references
    Setúbal, Sado
    0 references

    Identifiers

    POSEUR-03-2012-FC-000007
    0 references