Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana) (Q2982936): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption., remove_old_english_translation)
Property / summary
The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption. (English)
 
Property / summary: The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption. (English) / rank
Normal rank
 
Property / summary: The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:13, 9 July 2021

Project Q2982936 in Portugal
Language Label Description Also known as
English
Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana)
Project Q2982936 in Portugal

    Statements

    0 references
    521,867.39 Euro
    0 references
    85.0 percent
    0 references
    5 November 2019
    0 references
    28 February 2021
    0 references
    A.R.M. - ÁGUAS E RESÍDUOS DA MADEIRA, S.A.
    0 references
    0 references
    A Operação visa correção de situações operacionais identificadas (falhas abastecimento), que consistem, na substituição de troços de redes subdimensionados, nos quais se registam pressões desajustadas, caudal reduzido. A construção de 2 EE permitirá o aumento da capacidade de distribuição, solucionar as faltas de pressão no abastecimento naquelas zonas, uma vez que a rede implementada se revela insuficiente para satisfazer os consumos. (Portuguese)
    0 references

    Identifiers

    POSEUR-03-2012-FC-001421
    0 references