Integrated depollution of the Alguidar do Dueça – Implementation of sewage sewage networks – Connection to the Quinta de Cima sewage treatment plant (Q2982683): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio...) |
(Created claim: summary (P836): The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Du...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Dueça. (English) | |||||||||||||||
Property / summary: The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Dueça. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Dueça. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 02:11, 9 July 2021
Project Q2982683 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Integrated depollution of the Alguidar do Dueça – Implementation of sewage sewage networks – Connection to the Quinta de Cima sewage treatment plant |
Project Q2982683 in Portugal |
Statements
2,289,754.51 Euro
0 references
85.0 percent
0 references
1 March 2019
0 references
30 December 2022
0 references
APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
0 references
A operação consiste na execução de 4 sistemas elevatórios, constituídos por 4 EE e 1153.82ml de condutas elevatórias, 42908 ml de coletores gravíticos executando 749 ramais de ligação, que irão drenar vários aglomerados ainda não servidos na área de influencia do subsistema (baixa) e que terão ligação ao subsistema de penela-Emissário E1 (alta) e tratamento final na ETAR Quinta de Cima, com descarga do efluente para o Rio Dueça. (Portuguese)
0 references
The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Dueça. (English)
9 July 2021
0 references
Penela
0 references
Identifiers
POSEUR-03-2012-FC-001086
0 references