Renewal of Water Supply Networks in Baixa in the municipality of Santa Cruz (Q2982678): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks., remove_old_english_translation)
Property / summary
Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks. (English)
 
Property / summary: Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks. (English) / rank
Normal rank
 
Property / summary: Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:11, 9 July 2021

Project Q2982678 in Portugal
Language Label Description Also known as
English
Renewal of Water Supply Networks in Baixa in the municipality of Santa Cruz
Project Q2982678 in Portugal

    Statements

    0 references
    285,439.89 Euro
    0 references
    85.0 percent
    0 references
    12 July 2018
    0 references
    30 November 2020
    0 references
    MUNICÍPIO DE SANTA CRUZ
    0 references
    0 references
    Tendo-se identificado mau funcionamento hidráulico das redes de abastecimento de água no Município de Santa Cruz, pretende-se com esta operação a renovação das condutas mais antigas do Concelho, constituídas por materiais obsoletos e desadequados, e o aumento da sua capacidade, de modo a fazer face aos consumos atuais no Município, diminuindo as perdas de água e os custos de manutenção destas redes. (Portuguese)
    0 references
    Santa Cruz
    0 references

    Identifiers

    POSEUR-03-2012-FC-001077
    0 references