Remodeling of the Vieiro SAR (Q2982590): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Vieiro, belonging to the parish of Freixiel., remove_old_english_translation)
(‎Created claim: summary (P836): With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Vieiro, belonging to the parish of Freixiel., translated_summary)
Property / summary
 
With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Vieiro, belonging to the parish of Freixiel. (English)
Property / summary: With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Vieiro, belonging to the parish of Freixiel. (English) / rank
 
Normal rank
Property / summary: With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Vieiro, belonging to the parish of Freixiel. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:08, 9 July 2021

Project Q2982590 in Portugal
Language Label Description Also known as
English
Remodeling of the Vieiro SAR
Project Q2982590 in Portugal

    Statements

    0 references
    31,724.93 Euro
    0 references
    85.0 percent
    0 references
    1 November 2017
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE VILA FLOR
    0 references
    0 references

    41°18'53.68"N, 7°14'28.64"W
    0 references
    Com esta operação pretende-se dotar a ETAR existente de uma obra de entrada que garanta a eficiência dos equipamentos a jusante, de modo a ser assegurado o tratamento satisfatório das águas residuais urbanas da localidade de Vieiro, pertencente à freguesia de Freixiel. (Portuguese)
    0 references
    With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Vieiro, belonging to the parish of Freixiel. (English)
    9 July 2021
    0 references
    Vila Flor, Freixiel
    0 references

    Identifiers

    POSEUR-03-2012-FC-000849
    0 references