Drainage subsystem of Lamarosa (Lamarosa and Árgea) (Q2982541): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built., remove_old_english_...)
Property / summary
The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built. (English)
 
Property / summary: The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built. (English) / rank
Normal rank
 
Property / summary: The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:07, 9 July 2021

Project Q2982541 in Portugal
Language Label Description Also known as
English
Drainage subsystem of Lamarosa (Lamarosa and Árgea)
Project Q2982541 in Portugal

    Statements

    0 references
    1,431,570.01 Euro
    0 references
    85.0 percent
    0 references
    1 November 2017
    0 references
    31 December 2019
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references

    39°31'46.74"N, 8°29'14.39"W
    0 references
    A operação visa dotar as povoações de Árgea e de Lamarosa de um sistema de recolha, transporte e tratamento de águas residuais domésticas para 966 e.p., onde atualmente já existem redes em baixa mas sem tratamento associado e com descargas diretas para as linhas de água. Para o efeito serão construídas uma ETAR e as infraestruturas necessárias à integração das redes existentes (intercetores, sistemas elevatórios). (Portuguese)
    0 references
    Torres Novas, União das freguesias de Olaia e Paço
    0 references

    Identifiers

    POSEUR-03-2012-FC-000773
    0 references