Extension of the Water Supply Network in the Municipality of Penela (Q2982493): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., remove_old_english_tran...)
Property / summary
The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English)
 
Property / summary: The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) / rank
Normal rank
 
Property / summary: The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:06, 9 July 2021

Project Q2982493 in Portugal
Language Label Description Also known as
English
Extension of the Water Supply Network in the Municipality of Penela
Project Q2982493 in Portugal

    Statements

    0 references
    700,832.56 Euro
    0 references
    85.0 percent
    0 references
    1 April 2017
    0 references
    31 March 2020
    0 references
    MUNICÍPIO DE PENELA
    0 references
    0 references

    40°1'45.98"N, 8°23'24.86"W
    0 references
    A operação consiste na execução de condutas adutoras uma extensão total de 8.296m, dois reservatórios e uma estação elevatória, com ligação ao sistema em “Alta”, no sentido de garantir a eficiência deste sistema.A operação contempla a construção destas adutoras que irão garantir o abastecimento de água às localidades de Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela e Fonte Redoiça com ligação ao sistema “em alta”. (Portuguese)
    0 references
    Penela
    0 references

    Identifiers

    POSEUR-03-2012-FC-000704
    0 references