Extension of the Wastewater Sanitation Network of the municipality of Cantanhede Ançã Subsystem (Q2982150): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body)., remove_old_english_translation) |
(Created claim: summary (P836): The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body)., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English) | |||||||||||||||
Property / summary: The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:54, 9 July 2021
Project Q2982150 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the Wastewater Sanitation Network of the municipality of Cantanhede Ançã Subsystem |
Project Q2982150 in Portugal |
Statements
68,883.16 Euro
0 references
85.0 percent
0 references
1 June 2016
0 references
31 December 2019
0 references
INOVA - EMPRESA DE DESENVOLVIMENTO ECONÓMICO E SOCIAL DE CANTANHEDE, EM - S.A.
0 references
A solução de conceção da operação, compreende a construção de redes coletoras numa extensão de 0,94 km e 8 ramais domiciliários de esgoto, prevendo-se que sirva 20 habitantes (população residente), com um custo total de investimento de 81.039,01 uros (não inclui o IVA às taxas legais em vigor, já que é recuperável pela entidade gestora). (Portuguese)
0 references
The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English)
9 July 2021
0 references
Cantanhede
0 references
Identifiers
POSEUR-03-2012-FC-000211
0 references