Extension of São Teotónio water supply system – Casa Nova da Cruz (Q2982502): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation is part of the connection of the existing network in the village of Casa Nova da Cruz, whose supply is made from an uncontrolled origin to the distribution network of S. Teotónio. For this purpose, it is expected that the pipeline to be installed will be connected in the area of the Sobreirinho to the existing pipeline originating in the deposit of the Derrouca where the general supply node will be executed for the new pipeline tha...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Extension of São Teotónio water supply system – Casa Nova da Cruz

Revision as of 01:52, 9 July 2021

Project Q2982502 in Portugal
Language Label Description Also known as
English
Extension of São Teotónio water supply system – Casa Nova da Cruz
Project Q2982502 in Portugal

    Statements

    0 references
    174,088.01 Euro
    0 references
    85.0 percent
    0 references
    26 June 2018
    0 references
    6 January 2020
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references
    0 references

    37°30'10.48"N, 8°41'5.39"W
    0 references
    A operação consta da ligação da rede existente na povoação de Casa Nova da Cruz, cujo abastecimento é feito a partir de uma origem não controlada, à rede de distribuição de S. Teotónio. Para o efeito, prevê-se que a conduta a instalar seja ligada na zona do Sobreirinho à conduta existente com origem no depósito do Derrouca onde será executado o nó de abastecimento geral para a nova conduta que terá uma extensão de 4933 m até à Casa Nova da Cruz. (Portuguese)
    0 references
    The operation is part of the connection of the existing network in the village of Casa Nova da Cruz, whose supply is made from an uncontrolled origin to the distribution network of S. Teotónio. For this purpose, it is expected that the pipeline to be installed will be connected in the area of the Sobreirinho to the existing pipeline originating in the deposit of the Derrouca where the general supply node will be executed for the new pipeline that will have an extension of 4933 m until the Casa Nova da Cruz. (English)
    9 July 2021
    0 references
    Odemira, São Teotónio
    0 references

    Identifiers

    POSEUR-03-2012-FC-000717
    0 references