PROJETO INTEGRADO DE RECOLHA SELETIVA MULTIMATERIAL NO NORDESTE TRANSMONTANO (Q2981798): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The fulfillment of the goals set for the Northeastern Waste System reveals the need for the Project to apply, which translates into a selective collection system PaP, the optimisation and reinforcement of the selective collection and the implementation of a screening center. The project contributes to the optimisation of the existing waste management network in the System, by increasing proximity to the selective collection network., translated_...)
(‎Removed claim: summary (P836): The fulfillment of the goals set for the Northeastern Waste System reveals the need for the Project to apply, which translates into a selective collection system PaP, the optimisation and reinforcement of the selective collection and the implementation of a screening center. The project contributes to the optimisation of the existing waste management network in the System, by increasing proximity to the selective collection network., remove_ol...)
Property / summary
The fulfillment of the goals set for the Northeastern Waste System reveals the need for the Project to apply, which translates into a selective collection system PaP, the optimisation and reinforcement of the selective collection and the implementation of a screening center. The project contributes to the optimisation of the existing waste management network in the System, by increasing proximity to the selective collection network. (English)
 
Property / summary: The fulfillment of the goals set for the Northeastern Waste System reveals the need for the Project to apply, which translates into a selective collection system PaP, the optimisation and reinforcement of the selective collection and the implementation of a screening center. The project contributes to the optimisation of the existing waste management network in the System, by increasing proximity to the selective collection network. (English) / rank
Normal rank
 
Property / summary: The fulfillment of the goals set for the Northeastern Waste System reveals the need for the Project to apply, which translates into a selective collection system PaP, the optimisation and reinforcement of the selective collection and the implementation of a screening center. The project contributes to the optimisation of the existing waste management network in the System, by increasing proximity to the selective collection network. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 01:46, 9 July 2021

Project Q2981798 in Portugal
Language Label Description Also known as
English
PROJETO INTEGRADO DE RECOLHA SELETIVA MULTIMATERIAL NO NORDESTE TRANSMONTANO
Project Q2981798 in Portugal

    Statements

    0 references
    2,664,711.89 Euro
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    30 September 2021
    0 references
    RESIDUOS DO NORDESTE, EIM, S.A.
    0 references
    0 references

    41°29'22.63"N, 7°10'38.93"W
    0 references
    O cumprimento das metas definidas para o Sistema Resíduos do Nordeste revela a necessidade do Projeto a candidatar, o qual, se traduz num sistema de recolha seletiva PaP, na otimização e reforço da recolha seletiva e na implantação de um centro de triagem. O projeto contribui para a otimização da rede de gestão de resíduos existente no Sistema, com o aumento da proximidade à rede de recolha seletiva. (Portuguese)
    0 references
    Mirandela
    0 references

    Identifiers

    POSEUR-03-1911-FC-000009
    0 references