Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems (Q2982854): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application., translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems |
Revision as of 01:43, 9 July 2021
Project Q2982854 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems |
Project Q2982854 in Portugal |
Statements
198,374.24 Euro
0 references
85.0 percent
0 references
1 January 2020
0 references
31 December 2021
0 references
MUNICÍPIO DE POMBAL
0 references
A candidatura consiste na criação de 70 ZMC's nos 1.390 Km de rede e instalação de 70 medidores de caudal, de 147 válvulas de seccionamento e de 5 sistemas redutores de pressão, nas infraestruturas de AA já existente instalação de equipamento informático de gestão de redes e comunicação, visando a redução de perdas reais de água, que se estimam em 10% após a conclusão da empreitada a levar a efeito no âmbito desta candidatura. (Portuguese)
0 references
The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application. (English)
9 July 2021
0 references
Pombal
0 references
Identifiers
POSEUR-03-2012-FC-001297
0 references