Q2982502 (Q2982502): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Alentejo Litoral Subregion / rank
 
Normal rank

Revision as of 21:25, 8 July 2021

Project Q2982502 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982502 in Portugal

    Statements

    0 references
    174,088.01 Euro
    0 references
    85.0 percent
    0 references
    26 June 2018
    0 references
    6 January 2020
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references
    0 references

    37°30'10.48"N, 8°41'5.39"W
    0 references
    A operação consta da ligação da rede existente na povoação de Casa Nova da Cruz, cujo abastecimento é feito a partir de uma origem não controlada, à rede de distribuição de S. Teotónio. Para o efeito, prevê-se que a conduta a instalar seja ligada na zona do Sobreirinho à conduta existente com origem no depósito do Derrouca onde será executado o nó de abastecimento geral para a nova conduta que terá uma extensão de 4933 m até à Casa Nova da Cruz. (Portuguese)
    0 references
    Odemira, São Teotónio
    0 references

    Identifiers

    POSEUR-03-2012-FC-000717
    0 references