Q2913358 (Q2913358): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): The assistance covered by this application corresponds to the 2nd phase of modernisation of the Ovar-Gaia section, including the construction of level crossings, the complete renewal of the track between the PK 296+ 600 and the PK 332+ 780, the installation of electronic signalling systems, telecommunications and automatic speed control between the PK 299+ 885 and the PK 332+ 760 and the carrying out of studies and projects., translated_summary)
Property / summary
 
The assistance covered by this application corresponds to the 2nd phase of modernisation of the Ovar-Gaia section, including the construction of level crossings, the complete renewal of the track between the PK 296+ 600 and the PK 332+ 780, the installation of electronic signalling systems, telecommunications and automatic speed control between the PK 299+ 885 and the PK 332+ 760 and the carrying out of studies and projects. (English)
Property / summary: The assistance covered by this application corresponds to the 2nd phase of modernisation of the Ovar-Gaia section, including the construction of level crossings, the complete renewal of the track between the PK 296+ 600 and the PK 332+ 780, the installation of electronic signalling systems, telecommunications and automatic speed control between the PK 299+ 885 and the PK 332+ 760 and the carrying out of studies and projects. (English) / rank
 
Normal rank
Property / summary: The assistance covered by this application corresponds to the 2nd phase of modernisation of the Ovar-Gaia section, including the construction of level crossings, the complete renewal of the track between the PK 296+ 600 and the PK 332+ 780, the installation of electronic signalling systems, telecommunications and automatic speed control between the PK 299+ 885 and the PK 332+ 760 and the carrying out of studies and projects. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:06, 8 July 2021

Project Q2913358 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2913358 in Portugal

    Statements

    0 references
    118,738,326.73 Euro
    0 references
    85.0 percent
    0 references
    30 April 2014
    0 references
    31 December 2022
    0 references
    INFRAESTRUTURAS DE PORTUGAL, S.A.
    0 references
    0 references
    0 references
    A intervenção objeto da presente candidatura corresponde à 2.ª fase de modernização do troço Ovar-Gaia inclui a construção de desnivelamentos para supressão de passagens de nível, a renovação integral da via entre o PK 296+600 e o PK 332+780, a instalação de sistemas de sinalização eletrónica, telecomunicações e controlo automático de velocidade entre o PK 299+885 e o PK 332+760 e a realização de estudos e projetos. (Portuguese)
    0 references
    The assistance covered by this application corresponds to the 2nd phase of modernisation of the Ovar-Gaia section, including the construction of level crossings, the complete renewal of the track between the PK 296+ 600 and the PK 332+ 780, the installation of electronic signalling systems, telecommunications and automatic speed control between the PK 299+ 885 and the PK 332+ 760 and the carrying out of studies and projects. (English)
    8 July 2021
    0 references

    Identifiers

    POCI-04-2655-FC-000004
    0 references