REMODELING AND ADAPTATION OF THE NURSING HOME (R. ENG. CARLOS AMARANTE 105) (Q2898249): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): This operation resulted from the various problems identified in the ERPI building, which, because it is very old, is not adequate to the current requirements for the operation of ERPI’s, so this project addresses all these problems, and also adds significant improvements in the energy efficiency of the building and its comfort and functionality. This is a way of reshaping and adapting without increasing capacity., remove_old_english_translation)
(‎Created claim: summary (P836): This operation resulted from the various problems identified in the ERPI building, which, because it is very old, is not adequate to the current requirements for the operation of ERPI’s, so this project addresses all these problems, and also adds significant improvements in the energy efficiency of the building and its comfort and functionality. This is a way of reshaping and adapting without increasing capacity., translated_summary)
Property / summary
 
This operation resulted from the various problems identified in the ERPI building, which, because it is very old, is not adequate to the current requirements for the operation of ERPI’s, so this project addresses all these problems, and also adds significant improvements in the energy efficiency of the building and its comfort and functionality. This is a way of reshaping and adapting without increasing capacity. (English)
Property / summary: This operation resulted from the various problems identified in the ERPI building, which, because it is very old, is not adequate to the current requirements for the operation of ERPI’s, so this project addresses all these problems, and also adds significant improvements in the energy efficiency of the building and its comfort and functionality. This is a way of reshaping and adapting without increasing capacity. (English) / rank
 
Normal rank
Property / summary: This operation resulted from the various problems identified in the ERPI building, which, because it is very old, is not adequate to the current requirements for the operation of ERPI’s, so this project addresses all these problems, and also adds significant improvements in the energy efficiency of the building and its comfort and functionality. This is a way of reshaping and adapting without increasing capacity. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:07, 8 July 2021

Project Q2898249 in Portugal
Language Label Description Also known as
English
REMODELING AND ADAPTATION OF THE NURSING HOME (R. ENG. CARLOS AMARANTE 105)
Project Q2898249 in Portugal

    Statements

    0 references
    157,480.5 Euro
    0 references
    83.0 percent
    0 references
    2 November 2019
    0 references
    31 December 2021
    0 references
    BENEFICENCIA EVANGELICA DO PORTO
    0 references
    0 references

    41°10'26.22"N, 8°36'20.95"W
    0 references
    Esta operação resultou dos vários problemas identificados no edifício da ERPI, que por ser muito antigo, não se encontra adequado às exigências atuais para funcionamento das ERPI´s, pelo que este projeto vem colmatar todos esses problemas, e acrescenta ainda melhorias significativas ao nível da eficiência energética do edifício e ao conforto e funcionalidade do mesmo. Trata-se deste modo, de uma remodelação e adaptação sem aumento da capacidade. (Portuguese)
    0 references
    This operation resulted from the various problems identified in the ERPI building, which, because it is very old, is not adequate to the current requirements for the operation of ERPI’s, so this project addresses all these problems, and also adds significant improvements in the energy efficiency of the building and its comfort and functionality. This is a way of reshaping and adapting without increasing capacity. (English)
    8 July 2021
    0 references
    Porto, Paranhos
    0 references

    Identifiers

    NORTE-07-4842-FEDER-000147
    0 references