Q2895300 (Q2895300): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): The present intervention, of an infrastructural nature, is characterised by the integral requalification of the space, through the design and re-profiling of the general layout of the street, with the construction of a roundabout, with the aim of organising and facilitating the traffic in a strategic location, improvement of floors, construction of walks and park bays., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The present intervention, of an infrastructural nature, is characterised by the integral requalification of the space, through the design and re-profiling of the general layout of the street, with the construction of a roundabout, with the aim of organising and facilitating the traffic in a strategic location, improvement of floors, construction of walks and park bays. (English) | |||||||||||||||
Property / summary: The present intervention, of an infrastructural nature, is characterised by the integral requalification of the space, through the design and re-profiling of the general layout of the street, with the construction of a roundabout, with the aim of organising and facilitating the traffic in a strategic location, improvement of floors, construction of walks and park bays. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The present intervention, of an infrastructural nature, is characterised by the integral requalification of the space, through the design and re-profiling of the general layout of the street, with the construction of a roundabout, with the aim of organising and facilitating the traffic in a strategic location, improvement of floors, construction of walks and park bays. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:01, 8 July 2021
Project Q2895300 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895300 in Portugal |
Statements
475,158.66 Euro
0 references
85.0 percent
0 references
23 October 2019
0 references
30 October 2021
0 references
MUNICÍPIO DE LOUSADA
0 references
Q3000056 (Deleted Item)
0 references
A presente intervenção, de caráter infraestrutural, caracteriza-se pela requalificação integral do espaço, através do dimensionamento e reperfilamento do traçado geral do arruamento, com a construção de uma rotunda, com o intuito de organizar e facilitar o trânsito automóvel num local estratégico, beneficiação de pavimentos, construção de passeios e de baias de estacionamento. (Portuguese)
0 references
The present intervention, of an infrastructural nature, is characterised by the integral requalification of the space, through the design and re-profiling of the general layout of the street, with the construction of a roundabout, with the aim of organising and facilitating the traffic in a strategic location, improvement of floors, construction of walks and park bays. (English)
8 July 2021
0 references
Lousada
0 references
Identifiers
NORTE-04-2316-FEDER-000375
0 references