Q2894685 (Q2894685): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil)., translated_summary)
Property / summary
 
In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English)
Property / summary: In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English) / rank
 
Normal rank
Property / summary: In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:53, 8 July 2021

Project Q2894685 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2894685 in Portugal

    Statements

    0 references
    287,443.56 Euro
    0 references
    85.0 percent
    0 references
    1 January 2019
    0 references
    30 June 2020
    0 references
    MUNICÍPIO DE MOIMENTA DA BEIRA
    0 references

    40°57'20.09"N, 7°39'22.25"W
    0 references
    Na prática, a intervenção consiste na construção de um passeio/ciclovia com 3,0m de largura, com a dupla função de servir ciclistas e peões, e de uma faixa verde de proteção de 1,5m de largura, ao longo da EN226, (entre os aglomerados urbanos de Moimenta da Beira e de Leomil). (Portuguese)
    0 references
    In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English)
    8 July 2021
    0 references
    Moimenta da Beira, Leomil
    0 references

    Identifiers

    NORTE-03-1406-FEDER-000050
    0 references