CONSTRUCTION OF A TRANSFER CENTRE IN GRZYBÓW (Q2718681): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): As part of the implementation of the project, the Municipality of Kołobrzeg plans to implement: parking lots for 39 passenger cars, including 2 for persons with disabilities, this task will consist of the following expenditure: — Lower base layer of broken aggregate, layer thickness after thickening 20 cm, -Concrete curbs 15x22 cm in size, including concrete benches, on cement sand ballast, – Surfaces made of concrete pavement cubes thickness of...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
CONSTRUCTION OF A TRANSFER CENTRE IN GRZYBÓW |
Revision as of 02:22, 8 July 2021
Project Q2718681 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION OF A TRANSFER CENTRE IN GRZYBÓW |
Project Q2718681 in Poland |
Statements
90,320.0 zloty
0 references
179,960.97 zloty
0 references
50.19 percent
0 references
1 February 2021
0 references
30 June 2022
0 references
GMINA KOŁOBRZEG
0 references
W ramach realizacji projektu, wnioskodawca Gmina Kołobrzeg planuje zrealizować: parkingi na 39 miejsc dla samochodów osobowych, w tym 2 dla osób z niepełnosprawnością, przedmiotowe Zadanie będzie się składało z poniższych wydatków: - Dolna warstwa podbudowy z kruszywa łamanego, grubość warstwy po zagęszczeniu 20 cm, -Krawężniki betonowe wystające o wymiarach 15x22 cm, wraz z wykonaniem ław betonowych, na podsypce cementowo piaskowej, -Nawierzchnie z kostki brukowej betonowej grubości 8 cm, szarej, układane na podsypce cementowo piaskowej spoiny wypełniane piaskiem - Montaż wiaty przystankowej. Jako wydatki niekwalifikowane wykonane będą odcinek drogi wewnętrznej długości ok. 54 m , miejsce odpoczynku dla podróżnych z ławeczkami, zielenią, wiatą na rowery oraz odcinek ścieżki rowerowej – 278,17 m. P będzie realizowany w I etapie. P realizowany jako Typ 1: Budowa, przebudowa obiektów/systemu infrastruktury zintegrowanego systemu transportu publicznego w celu ograniczenia ruchu drogowego w centrach miast - budowa/przebudowa centrów przesiadkowych. P zostanie zrealizowany w terminie 03-02-2020 - 30-06-2021. Podmiotem realizującym oraz utrzymującym trwałość będzie Gmina Kołobrzeg. (Polish)
0 references
As part of the implementation of the project, the Municipality of Kołobrzeg plans to implement: parking lots for 39 passenger cars, including 2 for persons with disabilities, this task will consist of the following expenditure: — Lower base layer of broken aggregate, layer thickness after thickening 20 cm, -Concrete curbs 15x22 cm in size, including concrete benches, on cement sand ballast, – Surfaces made of concrete pavement cubes thickness of 8 cm, gray, laid on a cement sand weld filled with sand – Installation of the bus shelter. As ineligible expenditure a section of the internal road length of approx. 54 m, resting place for travellers with benches, greenery, bicycle shed and section of the cycle path – 278.17 m. P will be implemented in the first stage. P implemented as Type 1: Construction, reconstruction of facilities/infrastructure system of an integrated public transport system in order to reduce road traffic in city centres – construction/reconstruction of connecting centres. P will be completed by 03-02-2020-30-06-2021. The entity implementing and maintaining sustainability will be the Municipality of Kołobrzeg. (English)
8 July 2021
0 references
Identifiers
RPZP.02.03.00-32-0009/19
0 references