Q2713392 (Q2713392): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project concerns the modernisation of the Water Treatment Station located in Kamesznica with a target average daily water production Qśr. = 6 l/s = 518 m³/day. The project will extend the water treatment plant building, reconstruct the existing water treatment system by replacing existing fast filters with new turbidity up to 15 NTU and introduce an intelligent water system management system., translated_summary)
Property / summary
 
The project concerns the modernisation of the Water Treatment Station located in Kamesznica with a target average daily water production Qśr. = 6 l/s = 518 m³/day. The project will extend the water treatment plant building, reconstruct the existing water treatment system by replacing existing fast filters with new turbidity up to 15 NTU and introduce an intelligent water system management system. (English)
Property / summary: The project concerns the modernisation of the Water Treatment Station located in Kamesznica with a target average daily water production Qśr. = 6 l/s = 518 m³/day. The project will extend the water treatment plant building, reconstruct the existing water treatment system by replacing existing fast filters with new turbidity up to 15 NTU and introduce an intelligent water system management system. (English) / rank
 
Normal rank
Property / summary: The project concerns the modernisation of the Water Treatment Station located in Kamesznica with a target average daily water production Qśr. = 6 l/s = 518 m³/day. The project will extend the water treatment plant building, reconstruct the existing water treatment system by replacing existing fast filters with new turbidity up to 15 NTU and introduce an intelligent water system management system. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:36, 7 July 2021

Project Q2713392 in Poland
Language Label Description Also known as
English
No label defined
Project Q2713392 in Poland

    Statements

    0 references
    0 references
    1,000,000.0 zloty
    0 references
    222,300.0 Euro
    0.2223 Euro
    0 references
    1,217,071.09 zloty
    0 references
    270,554.9 Euro
    0.2223 Euro
    0 references
    82.16 percent
    0 references
    4 January 2021
    0 references
    31 December 2021
    0 references
    GMINA MILÓWKA
    0 references

    49°33'27.7"N, 19°5'15.7"E
    0 references
    Projekt dotyczy swoim zakresem modernizację Stację Uzdatniania Wody położoną w Kamesznicy o docelowej średnio dobowej produkcja wody Qśr. = 6 l/s = 518 m3/dobę. W ramach projektu zostanie przeprowadzona rozbudowa budynku stacji uzdatniania wody, przebudowany istniejący układ uzdatniania wody poprzez między innymi wymianę istniejących filtrów pospiesznych na nowe pracujące przy mętności do 15 NTU oraz wprowadzenie inteligentnego systemu zarządzania systemem wodociągowym. (Polish)
    0 references
    The project concerns the modernisation of the Water Treatment Station located in Kamesznica with a target average daily water production Qśr. = 6 l/s = 518 m³/day. The project will extend the water treatment plant building, reconstruct the existing water treatment system by replacing existing fast filters with new turbidity up to 15 NTU and introduce an intelligent water system management system. (English)
    8 July 2021
    0 references

    Identifiers

    RPSL.05.01.02-24-029C/20
    0 references