(‎Created claim: summary (P836): The applicant is Alina Wasiluk Parkiet Hajnówka, a medium-sized entrepreneur. The project concerns the installation of photovoltaic cells, from which the produced energy is used 100 % for the company’s own needs. The subject matter of the project does not concern activities excluded from the possibility of receiving support. The main problem the company faces in the energy context is its dependence on the power connection of the Forte Furniture...)
Property / summary
 
The applicant is Alina Wasiluk Parkiet Hajnówka, a medium-sized entrepreneur. The project concerns the installation of photovoltaic cells, from which the produced energy is used 100 % for the company’s own needs. The subject matter of the project does not concern activities excluded from the possibility of receiving support. The main problem the company faces in the energy context is its dependence on the power connection of the Forte Furniture Factory. Parkiet Hajnówka carries out its economic operations in part in the area bought from FORTE, but the electricity connection belongs to the neighbouring factory and the energy is sold by the Forte Factory. For the sake of energy security, Parkiet Hajnówka strives to become independent of its existing energy supplier. The planned project consists of the construction of a photovoltaic power plant with a capacity of 0.49938 MW with accompanying infrastructure: support frames, inverters, electrical installation nN, container transformer station up to 35 m² on junction Nos 1056/152 and 1056/91, located in Hajnówka at ul. 3 May. Hajnówka area 0001. The project covers: — installation of supporting structures on the ground, earthworks, – installation of photovoltaic panels on the structure, – installation of DC/AC inverters on the construction, – installation of designed electrical switchgears, -assembly of designed electrical installations nN-0.4 kV, -assembly of designed electrical installations SN-15 kV, -installation of the SN/nN station -grounding of the facility. As a result of the project, the photovoltaic power plant will be equipped with an installation and equipment producing electricity using solar energy. Total investment cost – PLN 2 673 166.02, eligible costs – PLN 1 779 692.94, co-financing of PLN 1 067 815.76. (English)
Property / summary: The applicant is Alina Wasiluk Parkiet Hajnówka, a medium-sized entrepreneur. The project concerns the installation of photovoltaic cells, from which the produced energy is used 100 % for the company’s own needs. The subject matter of the project does not concern activities excluded from the possibility of receiving support. The main problem the company faces in the energy context is its dependence on the power connection of the Forte Furniture Factory. Parkiet Hajnówka carries out its economic operations in part in the area bought from FORTE, but the electricity connection belongs to the neighbouring factory and the energy is sold by the Forte Factory. For the sake of energy security, Parkiet Hajnówka strives to become independent of its existing energy supplier. The planned project consists of the construction of a photovoltaic power plant with a capacity of 0.49938 MW with accompanying infrastructure: support frames, inverters, electrical installation nN, container transformer station up to 35 m² on junction Nos 1056/152 and 1056/91, located in Hajnówka at ul. 3 May. Hajnówka area 0001. The project covers: — installation of supporting structures on the ground, earthworks, – installation of photovoltaic panels on the structure, – installation of DC/AC inverters on the construction, – installation of designed electrical switchgears, -assembly of designed electrical installations nN-0.4 kV, -assembly of designed electrical installations SN-15 kV, -installation of the SN/nN station -grounding of the facility. As a result of the project, the photovoltaic power plant will be equipped with an installation and equipment producing electricity using solar energy. Total investment cost – PLN 2 673 166.02, eligible costs – PLN 1 779 692.94, co-financing of PLN 1 067 815.76. (English) / rank
 
Normal rank
Property / summary: The applicant is Alina Wasiluk Parkiet Hajnówka, a medium-sized entrepreneur. The project concerns the installation of photovoltaic cells, from which the produced energy is used 100 % for the company’s own needs. The subject matter of the project does not concern activities excluded from the possibility of receiving support. The main problem the company faces in the energy context is its dependence on the power connection of the Forte Furniture Factory. Parkiet Hajnówka carries out its economic operations in part in the area bought from FORTE, but the electricity connection belongs to the neighbouring factory and the energy is sold by the Forte Factory. For the sake of energy security, Parkiet Hajnówka strives to become independent of its existing energy supplier. The planned project consists of the construction of a photovoltaic power plant with a capacity of 0.49938 MW with accompanying infrastructure: support frames, inverters, electrical installation nN, container transformer station up to 35 m² on junction Nos 1056/152 and 1056/91, located in Hajnówka at ul. 3 May. Hajnówka area 0001. The project covers: — installation of supporting structures on the ground, earthworks, – installation of photovoltaic panels on the structure, – installation of DC/AC inverters on the construction, – installation of designed electrical switchgears, -assembly of designed electrical installations nN-0.4 kV, -assembly of designed electrical installations SN-15 kV, -installation of the SN/nN station -grounding of the facility. As a result of the project, the photovoltaic power plant will be equipped with an installation and equipment producing electricity using solar energy. Total investment cost – PLN 2 673 166.02, eligible costs – PLN 1 779 692.94, co-financing of PLN 1 067 815.76. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:41, 7 July 2021

Project Q2711202 in Poland
Language Label Description Also known as
English
No label defined
Project Q2711202 in Poland

    Statements

    0 references
    1,067,815.76 zloty
    0 references
    237,375.44 Euro
    0.2223 Euro
    0 references
    1,779,692.94 zloty
    0 references
    395,625.74 Euro
    0.2223 Euro
    0 references
    60.0 percent
    0 references
    8 April 2020
    0 references
    30 April 2021
    0 references
    ALINA WASILUK PARKIET HAJNÓWKA
    0 references
    0 references

    52°31'9.1"N, 23°21'43.2"E
    0 references
    Wnioskodawcą jest Alina Wasiluk Parkiet Hajnówka, będąca średnim przedsiębiorcą. Realizowany projekt dotyczy instalacji ogniw fotowoltaicznych, z których wyprodukowana energia przeznaczona jest 100% na potrzeby własne firmy. Przedmiot projektu nie dotyczy rodzajów działalności wykluczonych z możliwości uzyskania wsparcia. Zasadniczym problemem, z którym firma boryka się w kontekście energetycznym jest uzależnienie od przyłącza energetycznego Fabryki Mebli Forte. Firma Parkiet Hajnówka prowadzi swoje operacje gospodarcze w części na terenie odkupionym od FORTE, przyłącze energii elektrycznej należy jednak do sąsiadującej fabryki i energia jest firmie sprzedawana przez Fabrykę Forte. Ze względu na bezpieczeństwo energetyczne firmy Parkiet Hajnówka dąży do uniezależnienia się od dotychczasowego dostawcy energii. Planowane przedsięwzięcie polega na budowie elektrowni fotowoltaicznej o mocy 0,49938 MW z infrastrukturą towarzyszącą: stelażami wsporczymi, inwerterami, instalacją elektryczną nN, kontenerową stacją transformatorową do 35 m2 na dz. nr 1056/152 i 1056/91, zlokalizowanych w Hajnówce przy ul. 3 Maja gm. Hajnówka obręb 0001. Projekt obejmuje swoim zakresem: - montaż konstrukcji wsporczych na gruncie, -roboty ziemne, - montaż paneli fotowoltaicznych na konstrukcji, -montaż inwerterów DC/AC na konstrukcji, - montaż projektowanych rozdzielnic elektrycznych, -montaż projektowanych instalacji elektrycznych nN-0,4 kV, -montaż projektowanych instalacji elektrycznych SN-15 kV, -montaż stacji SN/nN -uziemienie obiektu. W wyniku realizacji projektu elektrownia fotowoltaiczna zostanie wyposażona w instalację i urządzenia produkujące energię elektryczną przy wykorzystaniu energii promieniowania słonecznego. Całkowity koszt inwestycji - 2 673 166,02 zł, koszty kwalifikowalne - 1 779 692,94 zł, dofinansowanie w wysokości - 1 067 815,76 zł. (Polish)
    0 references
    The applicant is Alina Wasiluk Parkiet Hajnówka, a medium-sized entrepreneur. The project concerns the installation of photovoltaic cells, from which the produced energy is used 100 % for the company’s own needs. The subject matter of the project does not concern activities excluded from the possibility of receiving support. The main problem the company faces in the energy context is its dependence on the power connection of the Forte Furniture Factory. Parkiet Hajnówka carries out its economic operations in part in the area bought from FORTE, but the electricity connection belongs to the neighbouring factory and the energy is sold by the Forte Factory. For the sake of energy security, Parkiet Hajnówka strives to become independent of its existing energy supplier. The planned project consists of the construction of a photovoltaic power plant with a capacity of 0.49938 MW with accompanying infrastructure: support frames, inverters, electrical installation nN, container transformer station up to 35 m² on junction Nos 1056/152 and 1056/91, located in Hajnówka at ul. 3 May. Hajnówka area 0001. The project covers: — installation of supporting structures on the ground, earthworks, – installation of photovoltaic panels on the structure, – installation of DC/AC inverters on the construction, – installation of designed electrical switchgears, -assembly of designed electrical installations nN-0.4 kV, -assembly of designed electrical installations SN-15 kV, -installation of the SN/nN station -grounding of the facility. As a result of the project, the photovoltaic power plant will be equipped with an installation and equipment producing electricity using solar energy. Total investment cost – PLN 2 673 166.02, eligible costs – PLN 1 779 692.94, co-financing of PLN 1 067 815.76. (English)
    8 July 2021
    0 references

    Identifiers

    RPPD.05.01.00-20-0623/19