Q2707521 (Q2707521): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The project involves obtaining a grant, which is necessary to maintain the current activity of CONSTRUM Andrzej Traczyk and jobs at the current level, i.e. 7.75 posts including the owner for at least 3 months. My company’s turnover from March 2020 to June 2020 compared to the same period of 2019 has decreased by 87.95 % since the outbreak of the pandemic and tightening. Thanks to the grant, I will maintain the financial liquidity of my company.,...) |
||||||||||||||
Property / summary | |||||||||||||||
The project involves obtaining a grant, which is necessary to maintain the current activity of CONSTRUM Andrzej Traczyk and jobs at the current level, i.e. 7.75 posts including the owner for at least 3 months. My company’s turnover from March 2020 to June 2020 compared to the same period of 2019 has decreased by 87.95 % since the outbreak of the pandemic and tightening. Thanks to the grant, I will maintain the financial liquidity of my company. (English) | |||||||||||||||
Property / summary: The project involves obtaining a grant, which is necessary to maintain the current activity of CONSTRUM Andrzej Traczyk and jobs at the current level, i.e. 7.75 posts including the owner for at least 3 months. My company’s turnover from March 2020 to June 2020 compared to the same period of 2019 has decreased by 87.95 % since the outbreak of the pandemic and tightening. Thanks to the grant, I will maintain the financial liquidity of my company. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project involves obtaining a grant, which is necessary to maintain the current activity of CONSTRUM Andrzej Traczyk and jobs at the current level, i.e. 7.75 posts including the owner for at least 3 months. My company’s turnover from March 2020 to June 2020 compared to the same period of 2019 has decreased by 87.95 % since the outbreak of the pandemic and tightening. Thanks to the grant, I will maintain the financial liquidity of my company. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 21:09, 7 July 2021
Project Q2707521 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2707521 in Poland |
Statements
62,268.63 zloty
0 references
62,268.63 zloty
0 references
100.0 percent
0 references
1 September 2020
0 references
30 November 2020
0 references
CONSTRUM ANDRZEJ TRACZYK
0 references
Projekt zakłada pozyskanie dotacji, która jest niezbędna do utrzymania bieżącej działalności firmy CONSTRUM Andrzej Traczyk oraz miejsc pracy na dotychczasowym poziomie tj. 7,75 etatu włącznie z właścicielem przez co najmniej 3 miesiące. Przez wystąpienie pandemii i wprowadzenie obostrzeń obroty mojej firmy od miesiąca marca 2020 do czerwca 2020 w porównaniu z tym samym okresem 2019 roku spadły o 87,95 % . Dzięki dotacji utrzymam płynność finansową swojej firmy. (Polish)
0 references
The project involves obtaining a grant, which is necessary to maintain the current activity of CONSTRUM Andrzej Traczyk and jobs at the current level, i.e. 7.75 posts including the owner for at least 3 months. My company’s turnover from March 2020 to June 2020 compared to the same period of 2019 has decreased by 87.95 % since the outbreak of the pandemic and tightening. Thanks to the grant, I will maintain the financial liquidity of my company. (English)
7 July 2021
0 references
Identifiers
RPMA.03.03.00-14-F928/20
0 references