Structural axis of Urban Mobility (Q2878129): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Castelo Branco / rank
 
Normal rank

Revision as of 20:54, 7 July 2021

Project Q2878129 in Portugal
Language Label Description Also known as
English
Structural axis of Urban Mobility
Project Q2878129 in Portugal

    Statements

    0 references
    105,756.79 Euro
    0 references
    85.0 percent
    0 references
    22 May 2015
    0 references
    31 July 2016
    0 references
    MUNICIPIO DE CASTELO BRANCO
    0 references

    39°49'35.87"N, 7°29'30.95"W
    0 references
    Com a presente operação, pretende-se proceder à construção da ligação pedonal entre a zona sul da cidade, no início da Avenida Professor Dr. Egas Moniz, e a zona industrial, numa extensão cerca de 563 metros, de forma a dar continuidade aos passeios existentes junto às edificações e acessos, garantindo assim o acesso pedonal à zona industrial em melhores condições de circulação e segurança por parte dos peões e do trânsito rodoviário. (Portuguese)
    0 references
    With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English)
    7 July 2021
    0 references
    Castelo Branco, Castelo Branco
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000001
    0 references