(‎Created claim: summary (P836): The object of the project is the construction of a photovoltage installation with an installed capacity of 0.0489 MW covering the company’s own needs for electricity, on plot No 780/2 in Przybysławice within Garbów Municipality. The applicant has the right to real estate on the basis of lease agreements for an indefinite period from the partners of the Applicant’s company. The power plant will consist of high-performance photovoltaic panels (136...)
Property / summary
 
The object of the project is the construction of a photovoltage installation with an installed capacity of 0.0489 MW covering the company’s own needs for electricity, on plot No 780/2 in Przybysławice within Garbów Municipality. The applicant has the right to real estate on the basis of lease agreements for an indefinite period from the partners of the Applicant’s company. The power plant will consist of high-performance photovoltaic panels (136 units with a power of 260 W, assuming a high minimum efficiency factor of the module) installed on frames made of galvanised steel and aluminium with a 25° gradient, connected to inverters with an efficiency of at least 98 %. The above is detailed in the technical design and cost estimate. Due to the location of the farm (one of the most sunny regions in the country) and the advanced technology, the planned installation will be able to produce a total of around 54 MWh of electricity in the course of the year. The electricity produced will be used to ensure the company’s own needs. The estimated lifetime of the installation is 25 years. The technology used meets the EU ecological criteria and standards set out in the PKN President’s Notice on the list of harmonised standards. The project will be implemented in the second half of 2021. As of the date of submission of the application, the Applicant has all formal and legal documents (in accordance with Article 29 para. 2 point 16 of the Construction Law The installation of photovoltaic devices with an installed electrical capacity of up to 50 kW and freestanding collectors does not require notification to the competent authority or a building permit), including securing the own contribution, there is no risk of the project not being implemented for reasons beyond the control of the Applicant. The project will be implemented in one step. The project will result in a reduction of CO2 emissions into the atmosphere. The project will have a positive impact on the following recipients: — applicant, – electricity consumers. (English)
Property / summary: The object of the project is the construction of a photovoltage installation with an installed capacity of 0.0489 MW covering the company’s own needs for electricity, on plot No 780/2 in Przybysławice within Garbów Municipality. The applicant has the right to real estate on the basis of lease agreements for an indefinite period from the partners of the Applicant’s company. The power plant will consist of high-performance photovoltaic panels (136 units with a power of 260 W, assuming a high minimum efficiency factor of the module) installed on frames made of galvanised steel and aluminium with a 25° gradient, connected to inverters with an efficiency of at least 98 %. The above is detailed in the technical design and cost estimate. Due to the location of the farm (one of the most sunny regions in the country) and the advanced technology, the planned installation will be able to produce a total of around 54 MWh of electricity in the course of the year. The electricity produced will be used to ensure the company’s own needs. The estimated lifetime of the installation is 25 years. The technology used meets the EU ecological criteria and standards set out in the PKN President’s Notice on the list of harmonised standards. The project will be implemented in the second half of 2021. As of the date of submission of the application, the Applicant has all formal and legal documents (in accordance with Article 29 para. 2 point 16 of the Construction Law The installation of photovoltaic devices with an installed electrical capacity of up to 50 kW and freestanding collectors does not require notification to the competent authority or a building permit), including securing the own contribution, there is no risk of the project not being implemented for reasons beyond the control of the Applicant. The project will be implemented in one step. The project will result in a reduction of CO2 emissions into the atmosphere. The project will have a positive impact on the following recipients: — applicant, – electricity consumers. (English) / rank
 
Normal rank
Property / summary: The object of the project is the construction of a photovoltage installation with an installed capacity of 0.0489 MW covering the company’s own needs for electricity, on plot No 780/2 in Przybysławice within Garbów Municipality. The applicant has the right to real estate on the basis of lease agreements for an indefinite period from the partners of the Applicant’s company. The power plant will consist of high-performance photovoltaic panels (136 units with a power of 260 W, assuming a high minimum efficiency factor of the module) installed on frames made of galvanised steel and aluminium with a 25° gradient, connected to inverters with an efficiency of at least 98 %. The above is detailed in the technical design and cost estimate. Due to the location of the farm (one of the most sunny regions in the country) and the advanced technology, the planned installation will be able to produce a total of around 54 MWh of electricity in the course of the year. The electricity produced will be used to ensure the company’s own needs. The estimated lifetime of the installation is 25 years. The technology used meets the EU ecological criteria and standards set out in the PKN President’s Notice on the list of harmonised standards. The project will be implemented in the second half of 2021. As of the date of submission of the application, the Applicant has all formal and legal documents (in accordance with Article 29 para. 2 point 16 of the Construction Law The installation of photovoltaic devices with an installed electrical capacity of up to 50 kW and freestanding collectors does not require notification to the competent authority or a building permit), including securing the own contribution, there is no risk of the project not being implemented for reasons beyond the control of the Applicant. The project will be implemented in one step. The project will result in a reduction of CO2 emissions into the atmosphere. The project will have a positive impact on the following recipients: — applicant, – electricity consumers. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:17, 7 July 2021

Project Q2705842 in Poland
Language Label Description Also known as
English
No label defined
Project Q2705842 in Poland

    Statements

    0 references
    121,718.73 zloty
    0 references
    27,058.07 Euro
    0.2223 Euro
    0 references
    187,259.59 zloty
    0 references
    41,627.81 Euro
    0.2223 Euro
    0 references
    65.0 percent
    0 references
    1 October 2021
    0 references
    30 September 2022
    0 references
    VELKOM W.L.K.M. KURCZUK S.C. LIDIA GOLIANEK-KURCZUK, MICHAŁ KURCZUK, KRZYSZTOF KURCZUK
    0 references
    0 references

    51°21'18.4"N, 22°19'45.8"E
    0 references
    Przedmiotem projektu jest wykonanie instalacji fotowolt. o mocy zainstalowanej 0,0489 MW pokrywającej potrzeby własne przedsiębiorstwa na energie elektryczną, na działce nr 780/2 w Przybysławicach w obrębie Gminy Garbów. Wnioskodawca posiada prawo do nieruchomości na podstawie umów najmu na czas nieokreślony od wspólników spółki Wnioskodawcy. Elektrownia będzie się składać z wysokowydajnych paneli fotowoltaicznych (136 szt. o mocy 260 W, zakładając wysoki minimalny współczynnik skuteczności modułu) zainstalowanych na stelażach wykonanych z ocynkowanej stali i aluminium o kacie nachylenia 25º, podłączonych do inwerterów o sprawności co najmniej 98%. Szczegółowo powyższe przedstawiono w projekcie technicznym oraz kosztorysie. Ze względu na położenie farmy (jeden z najbardziej nasłonecznionych regionów w kraju) oraz zaawansowaną technologię projektowana instalacja będzie w stanie wyprodukować w ciągu roku łącznie około 54 MWh energii elektr. Wytworzona energia elektr. będzie zużyta na zapewnienie potrzeb własnych przedsiębiorstwa. Przewidywany czas eksploatacji instalacji to 25 lat. Zastosowana technologia spełnia kryteria i normy ekologiczne UE określone w obwieszczeniach Prezesa PKN w sprawie wykazu norm zharmonizowanych. Projekt będzie realizowany w II połowie 2021 r. Na dzień złożenia wniosku Wnioskodawca posiada wszystkie formalno-prawne dokumenty (zgodnie z art. 29 ust. 2 pkt 16 Prawa Budowlanego Montaż urządzeń fotowoltaicznych o zainstalowanej mocy elektrycznej do 50 kW oraz wolnostojących kolektorów nie wymaga zgłoszenia właściwemu organowi ani pozwolenia na budowę), włącznie z zabezpieczeniem wkładu własnego, nie występuje ryzyko nie zrealizowania projektu z przyczyn niezależnych od Wnioskodawcy. Projekt będzie realizowany jednoetapowo. W wyniku realizacji projektu nastąpi zmniejszenie emisji CO2 do atmosfery. Projekt będzie miał pozytywny wpływ na następujących odbiorców: - wnioskodawca, - odbiorcy energii elektrycznej. (Polish)
    0 references
    The object of the project is the construction of a photovoltage installation with an installed capacity of 0.0489 MW covering the company’s own needs for electricity, on plot No 780/2 in Przybysławice within Garbów Municipality. The applicant has the right to real estate on the basis of lease agreements for an indefinite period from the partners of the Applicant’s company. The power plant will consist of high-performance photovoltaic panels (136 units with a power of 260 W, assuming a high minimum efficiency factor of the module) installed on frames made of galvanised steel and aluminium with a 25° gradient, connected to inverters with an efficiency of at least 98 %. The above is detailed in the technical design and cost estimate. Due to the location of the farm (one of the most sunny regions in the country) and the advanced technology, the planned installation will be able to produce a total of around 54 MWh of electricity in the course of the year. The electricity produced will be used to ensure the company’s own needs. The estimated lifetime of the installation is 25 years. The technology used meets the EU ecological criteria and standards set out in the PKN President’s Notice on the list of harmonised standards. The project will be implemented in the second half of 2021. As of the date of submission of the application, the Applicant has all formal and legal documents (in accordance with Article 29 para. 2 point 16 of the Construction Law The installation of photovoltaic devices with an installed electrical capacity of up to 50 kW and freestanding collectors does not require notification to the competent authority or a building permit), including securing the own contribution, there is no risk of the project not being implemented for reasons beyond the control of the Applicant. The project will be implemented in one step. The project will result in a reduction of CO2 emissions into the atmosphere. The project will have a positive impact on the following recipients: — applicant, – electricity consumers. (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0005/20