(Created claim: summary (P836): The object of the project is the purchase and installation of heat pumps, solar collectors, biomass furnaces and photovoltaic cells. The total number of installed installations on private buildings and public buildings in the municipality of Michów will be 383 units. (total installed capacity 1,97 MW). Types of individual installations: collectors 2 panels (power 3.4 kW) – 80 collectors 3 panels (5.1 kW) – 5 boilers 20 kW – 10 boilers 25 kW – 12...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the purchase and installation of heat pumps, solar collectors, biomass furnaces and photovoltaic cells. The total number of installed installations on private buildings and public buildings in the municipality of Michów will be 383 units. (total installed capacity 1,97 MW). Types of individual installations: collectors 2 panels (power 3.4 kW) – 80 collectors 3 panels (5.1 kW) – 5 boilers 20 kW – 10 boilers 25 kW – 12 pump units (3.5 kW) – 29 photo units with a power of 3.1 kW – 58 photo units with a power of 3.72 kW – 30 units, 4,34 kW – 78 units, photo 4.96 kW – 49 photo pieces 5.89 kW – 29 photo pieces 8.99 kW – 3 pieces. Existing conventional sources of electricity and heat will be replaced by free solar energy, aerothermal energy and biomass. The implementation of the specific objectives will indirectly increase the tourist attractiveness of the region, improve the living conditions of its inhabitants and directly improve the natural environment. The target group will be residents of the municipality of Michów (private users) who expressed their willingness to join the project expressed in the form of a survey. Project indicators – additional renewable energy generation capacity – 1.97 MW. Electricity production – 1017.20 MW/year. Number of heat-generating units – 136. Number of power-generating units – 247 pcs. Decrease in emissions of CO 2-1099.64 Mg/year. Air quality in the municipality is good; there is no obligation to develop an air quality programme. No corrective or short-term actions for the Municipality of Michów were indicated in the Lublin POP, which means that there were no exceedances of the levels of substances subject to air quality assessment. Public buildings on which photovoltaic installations will be installed: municipal Office building in Michów, Primary School in Rudno, School Complex in Michów, Primary School in Katarzyna, Kindergarten in Michów. (English) | |||||||||||||||
Property / summary: The object of the project is the purchase and installation of heat pumps, solar collectors, biomass furnaces and photovoltaic cells. The total number of installed installations on private buildings and public buildings in the municipality of Michów will be 383 units. (total installed capacity 1,97 MW). Types of individual installations: collectors 2 panels (power 3.4 kW) – 80 collectors 3 panels (5.1 kW) – 5 boilers 20 kW – 10 boilers 25 kW – 12 pump units (3.5 kW) – 29 photo units with a power of 3.1 kW – 58 photo units with a power of 3.72 kW – 30 units, 4,34 kW – 78 units, photo 4.96 kW – 49 photo pieces 5.89 kW – 29 photo pieces 8.99 kW – 3 pieces. Existing conventional sources of electricity and heat will be replaced by free solar energy, aerothermal energy and biomass. The implementation of the specific objectives will indirectly increase the tourist attractiveness of the region, improve the living conditions of its inhabitants and directly improve the natural environment. The target group will be residents of the municipality of Michów (private users) who expressed their willingness to join the project expressed in the form of a survey. Project indicators – additional renewable energy generation capacity – 1.97 MW. Electricity production – 1017.20 MW/year. Number of heat-generating units – 136. Number of power-generating units – 247 pcs. Decrease in emissions of CO 2-1099.64 Mg/year. Air quality in the municipality is good; there is no obligation to develop an air quality programme. No corrective or short-term actions for the Municipality of Michów were indicated in the Lublin POP, which means that there were no exceedances of the levels of substances subject to air quality assessment. Public buildings on which photovoltaic installations will be installed: municipal Office building in Michów, Primary School in Rudno, School Complex in Michów, Primary School in Katarzyna, Kindergarten in Michów. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the purchase and installation of heat pumps, solar collectors, biomass furnaces and photovoltaic cells. The total number of installed installations on private buildings and public buildings in the municipality of Michów will be 383 units. (total installed capacity 1,97 MW). Types of individual installations: collectors 2 panels (power 3.4 kW) – 80 collectors 3 panels (5.1 kW) – 5 boilers 20 kW – 10 boilers 25 kW – 12 pump units (3.5 kW) – 29 photo units with a power of 3.1 kW – 58 photo units with a power of 3.72 kW – 30 units, 4,34 kW – 78 units, photo 4.96 kW – 49 photo pieces 5.89 kW – 29 photo pieces 8.99 kW – 3 pieces. Existing conventional sources of electricity and heat will be replaced by free solar energy, aerothermal energy and biomass. The implementation of the specific objectives will indirectly increase the tourist attractiveness of the region, improve the living conditions of its inhabitants and directly improve the natural environment. The target group will be residents of the municipality of Michów (private users) who expressed their willingness to join the project expressed in the form of a survey. Project indicators – additional renewable energy generation capacity – 1.97 MW. Electricity production – 1017.20 MW/year. Number of heat-generating units – 136. Number of power-generating units – 247 pcs. Decrease in emissions of CO 2-1099.64 Mg/year. Air quality in the municipality is good; there is no obligation to develop an air quality programme. No corrective or short-term actions for the Municipality of Michów were indicated in the Lublin POP, which means that there were no exceedances of the levels of substances subject to air quality assessment. Public buildings on which photovoltaic installations will be installed: municipal Office building in Michów, Primary School in Rudno, School Complex in Michów, Primary School in Katarzyna, Kindergarten in Michów. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 20:17, 7 July 2021
Project Q2705826 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2705826 in Poland |
Statements
3,169,078.0 zloty
0 references
5,761,960.0 zloty
0 references
55.0 percent
0 references
21 August 2019
0 references
31 December 2021
0 references
GMINA MICHÓW
0 references
Przedmiotem projektu jest zakup i instalacja pomp ciepła, kolektorów słonecznych, pieców na biomasę i ogniw fotowoltaicznych. Łączna ilość zamontowanych instalacji na obiektach prywatnych i budynkach użyteczności publicznej w Gminie Michów wyniesie 383 szt. (łączna moc zainstalowana 1,97 MW). Rodzaje poszczególnych instalacji: kolektory 2 panele (moc 3,4 kW) - 80 sztuk kolektory 3 panele (moc 5,1 kW) - 5 sztuk kotły 20 kW - 10 sztuk kotły 25 kW - 12 sztuk pompy (moc 3,5 kW) - 29 sztuk foto o mocy 3,1 kW - 58 sztuk foto o mocy 3,72 kW - 30 sztuk, foto o mocy 4,34 kW - 78 sztuk, foto 4,96 kW - 49 sztuk foto 5,89 kW - 29 sztuk foto 8,99 kW - 3 sztuki. Dotychczasowe konwencjonalne źródła energii elektrycznej i cieplnej zostaną zastąpione darmową energią słoneczną, aerotermalną oraz biomasą. Realizacja celów szczegółowych wpłynie pośrednio na wzrost atrakcyjności turystycznej regionu, poprawę warunków życia jego mieszkańców oraz bezpośrednio na poprawę stanu środowiska naturalnego.Grupą docelową będą mieszkańcy gminy Michów (użytkownicy prywatni), którzy wyrazili chęć przystąpienia do projektu wyrażoną w formie ankiety. Wskaźniki projektu- dodatkowa moc wytwarzania energii odnawialnej - 1,97 MW. Produkcja energii elektrycznej - 1017,20 MW/rok. Liczba jednostek wytwarzania energii cieplnej - 136. Liczba jednostek wytwarzania energii elektrycznej- 247 szt. Spadek emisji CO 2 - 1099,64 Mg/rok.Jakość powietrza w gminie jest dobra; nie ma obowiązku opracowania programu ochrony powietrza. W POP dla strefy lubelskiej nie wskazano działań naprawczych ani krótkoterminowych dla gminy Michów, co oznacza że na jej terenie nie odnotowano przekroczenia poziomów substancji podlegających ocenie jakości powietrza. Budynki użyteczności publicznej, na których zamontowane będą instalacje fotowoltaiczne: budynek Urzędu gminy w Michowie, Szkoła Podstawowa w Rudnie, Zespół Szkół w Michowie, Szkoła Podstawowa w Katarzynie, Przedszkole w Michowie. (Polish)
0 references
The object of the project is the purchase and installation of heat pumps, solar collectors, biomass furnaces and photovoltaic cells. The total number of installed installations on private buildings and public buildings in the municipality of Michów will be 383 units. (total installed capacity 1,97 MW). Types of individual installations: collectors 2 panels (power 3.4 kW) – 80 collectors 3 panels (5.1 kW) – 5 boilers 20 kW – 10 boilers 25 kW – 12 pump units (3.5 kW) – 29 photo units with a power of 3.1 kW – 58 photo units with a power of 3.72 kW – 30 units, 4,34 kW – 78 units, photo 4.96 kW – 49 photo pieces 5.89 kW – 29 photo pieces 8.99 kW – 3 pieces. Existing conventional sources of electricity and heat will be replaced by free solar energy, aerothermal energy and biomass. The implementation of the specific objectives will indirectly increase the tourist attractiveness of the region, improve the living conditions of its inhabitants and directly improve the natural environment. The target group will be residents of the municipality of Michów (private users) who expressed their willingness to join the project expressed in the form of a survey. Project indicators – additional renewable energy generation capacity – 1.97 MW. Electricity production – 1017.20 MW/year. Number of heat-generating units – 136. Number of power-generating units – 247 pcs. Decrease in emissions of CO 2-1099.64 Mg/year. Air quality in the municipality is good; there is no obligation to develop an air quality programme. No corrective or short-term actions for the Municipality of Michów were indicated in the Lublin POP, which means that there were no exceedances of the levels of substances subject to air quality assessment. Public buildings on which photovoltaic installations will be installed: municipal Office building in Michów, Primary School in Rudno, School Complex in Michów, Primary School in Katarzyna, Kindergarten in Michów. (English)
7 July 2021
0 references