(Created claim: summary (P836): The project involves the installation of 353 RES installations: — 171 photovoltaic installations with a total capacity of 0.58 MW on municipal residents’ buildings (capacity: 18pcs – 2.1 kW, 61pcs. — 3.0 kW and 92pcs. — 3,9 kW), – 134 solar installations (with a total capacity of 0.467 MW) on the buildings of residents of the municipality (capacity: ), – 46 biomass kilns (with a total capacity of 0,91 MW: 16 units with a capacity of 15KW, 17 uni...) |
||||||||||||||
Property / summary | |||||||||||||||
The project involves the installation of 353 RES installations: — 171 photovoltaic installations with a total capacity of 0.58 MW on municipal residents’ buildings (capacity: 18pcs – 2.1 kW, 61pcs. — 3.0 kW and 92pcs. — 3,9 kW), – 134 solar installations (with a total capacity of 0.467 MW) on the buildings of residents of the municipality (capacity: ), – 46 biomass kilns (with a total capacity of 0,91 MW: 16 units with a capacity of 15KW, 17 units with a capacity of 20KW, 13 units with a capacity of 25 kW) in the buildings of residents of the municipality, – 2 stoves for biomass (with a total capacity of 0.15 MW: 30 kW – building of the Health Centre in Tworyczów, and 120 kW – Remizo-Świetlice building in the city of Sułów) in public buildings, intended for CWU, CO and electricity. The project also provides for the design and execution of an online portal, which will perform educational, promotional and on-line services. TARGET GROUP: okay, okay, okay. 1600 inhabitants of the municipality of Sułów (GS). MAIN OBJECTIVE: increase the stakes. RES in GM. RES indicators: Additional ability to renew —2,1 MW; Estimated year of decline in gas. heat.(CI34) – 1394.19 t; Prod. en. electr. —521.64 MWhe/year; Prod. en. heat. —1475,48 MWhe/year. P. pursues the priority objective. 4 and main objective of the ROP PP. Complies with: SRG 2015-2020: objective 4; SRWL 2014-2020 Objectives 2.5, 3.6 and 4.5; RSI WL 2020 – smart specialisation of the region, proze WL and PZP WL – prevention of the area for the development of renewable energy. On the basis of the AIR PROGRAMME FOR the LUBLE STRESS in G., there was no exceedance of at least one limit or target level for substances subject to an air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving the air quality by reducing PM10 emissions and the promotional and educational measures envisaged in Mr PROJEKT counteract the phenomenon of the ENERGETIC BUSINESS OF THE MUSHING GUARANTEE. (English) | |||||||||||||||
Property / summary: The project involves the installation of 353 RES installations: — 171 photovoltaic installations with a total capacity of 0.58 MW on municipal residents’ buildings (capacity: 18pcs – 2.1 kW, 61pcs. — 3.0 kW and 92pcs. — 3,9 kW), – 134 solar installations (with a total capacity of 0.467 MW) on the buildings of residents of the municipality (capacity: ), – 46 biomass kilns (with a total capacity of 0,91 MW: 16 units with a capacity of 15KW, 17 units with a capacity of 20KW, 13 units with a capacity of 25 kW) in the buildings of residents of the municipality, – 2 stoves for biomass (with a total capacity of 0.15 MW: 30 kW – building of the Health Centre in Tworyczów, and 120 kW – Remizo-Świetlice building in the city of Sułów) in public buildings, intended for CWU, CO and electricity. The project also provides for the design and execution of an online portal, which will perform educational, promotional and on-line services. TARGET GROUP: okay, okay, okay. 1600 inhabitants of the municipality of Sułów (GS). MAIN OBJECTIVE: increase the stakes. RES in GM. RES indicators: Additional ability to renew —2,1 MW; Estimated year of decline in gas. heat.(CI34) – 1394.19 t; Prod. en. electr. —521.64 MWhe/year; Prod. en. heat. —1475,48 MWhe/year. P. pursues the priority objective. 4 and main objective of the ROP PP. Complies with: SRG 2015-2020: objective 4; SRWL 2014-2020 Objectives 2.5, 3.6 and 4.5; RSI WL 2020 – smart specialisation of the region, proze WL and PZP WL – prevention of the area for the development of renewable energy. On the basis of the AIR PROGRAMME FOR the LUBLE STRESS in G., there was no exceedance of at least one limit or target level for substances subject to an air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving the air quality by reducing PM10 emissions and the promotional and educational measures envisaged in Mr PROJEKT counteract the phenomenon of the ENERGETIC BUSINESS OF THE MUSHING GUARANTEE. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project involves the installation of 353 RES installations: — 171 photovoltaic installations with a total capacity of 0.58 MW on municipal residents’ buildings (capacity: 18pcs – 2.1 kW, 61pcs. — 3.0 kW and 92pcs. — 3,9 kW), – 134 solar installations (with a total capacity of 0.467 MW) on the buildings of residents of the municipality (capacity: ), – 46 biomass kilns (with a total capacity of 0,91 MW: 16 units with a capacity of 15KW, 17 units with a capacity of 20KW, 13 units with a capacity of 25 kW) in the buildings of residents of the municipality, – 2 stoves for biomass (with a total capacity of 0.15 MW: 30 kW – building of the Health Centre in Tworyczów, and 120 kW – Remizo-Świetlice building in the city of Sułów) in public buildings, intended for CWU, CO and electricity. The project also provides for the design and execution of an online portal, which will perform educational, promotional and on-line services. TARGET GROUP: okay, okay, okay. 1600 inhabitants of the municipality of Sułów (GS). MAIN OBJECTIVE: increase the stakes. RES in GM. RES indicators: Additional ability to renew —2,1 MW; Estimated year of decline in gas. heat.(CI34) – 1394.19 t; Prod. en. electr. —521.64 MWhe/year; Prod. en. heat. —1475,48 MWhe/year. P. pursues the priority objective. 4 and main objective of the ROP PP. Complies with: SRG 2015-2020: objective 4; SRWL 2014-2020 Objectives 2.5, 3.6 and 4.5; RSI WL 2020 – smart specialisation of the region, proze WL and PZP WL – prevention of the area for the development of renewable energy. On the basis of the AIR PROGRAMME FOR the LUBLE STRESS in G., there was no exceedance of at least one limit or target level for substances subject to an air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving the air quality by reducing PM10 emissions and the promotional and educational measures envisaged in Mr PROJEKT counteract the phenomenon of the ENERGETIC BUSINESS OF THE MUSHING GUARANTEE. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 20:16, 7 July 2021
Project Q2705755 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2705755 in Poland |
Statements
2,913,305.26 zloty
0 references
4,414,098.9 zloty
0 references
66.0 percent
0 references
4 July 2019
0 references
30 November 2022
0 references
GMINA SUŁÓW
0 references
Projekt zakłada instalację 353 szt. instalacji OZE: - 171 szt. instalacji fotowoltaicznych o łącznej mocy 0,58 MW na budynkach mieszkańców gminy (o mocach: 18szt - 2,1 kW, 61szt. - 3,0 kW i 92szt. - 3,9 kW), - 134 szt. instalacji solarnych (o łącznej mocy 0,467 MW) na budynkach mieszkańców gminy (o mocach: ), - 46 szt. pieców na biomasę (o łącznej mocy 0,91 MW: 16 szt. o mocy 15KW, 17 szt. o mocy 20KW, 13 szt. o mocy 25kW) w budynkach mieszkańców gminy, - 2 pieców na biomasę (o łącznej mocy 0,15 MW: 30kW - budynek Ośrodka Zdrowia w m. Tworyczów, i 120 kW - budynek Remizo-Świetlicy w m. Sułów) w budynkach użyteczności publicznej, z przeznaczeniem do CWU, CO i energii elektrycznej. Projekt przewiduje również zaprojektowanie i wykonanie portalu internetowego, który będzie pełnił funkcje edukacyjne, promocyjne oraz oferował usługi on-line. GRUPA DOCELOWA: ok. 1600 mieszkańców gminy Sułów (GS). CEL GŁÓWNY: zwiększ. stosow. OZE na terenie GM. WSKAŹNIKI REZULTATU: Dodatkowa zdolność wytw. en. ze źr. odnaw. -2,1 MW; Szacow. rocz. spad. em. gaz. cieplarn.(CI34) - 1394,19 t; Prod. en. elektr. ( )-521,64 MWhe/rok; Prod. en. ciepl. ( )-1475,48 MWhe/rok. P. realizuje cel prioryt. 4 i cel główny RPO WL. Jest zgodny z: SRG 2015-2020: cel 4; SRWL 2014-2020 cel 2.5, 3.6 oraz 4.5; RSI WL 2020 - inteligentna specjalizacja regionu, PROZE WL oraz PZP WL- prewencyjność obszaru do rozwoju energetyki odnawialnej. Na podstawie PROGRAMU OCHRONY POWIETRZA DLA STREFY LUBELSKIEJ w G. nie stwierdzono przekroczenie choćby jednego poziomu dopuszczalnego lub docelowego w odniesieniu do substancji podlegających ocenie jakości powietrza. Jednakże działania przewidziane w P. przyczyniają się do realizacji działań naprawczych mających na celu poprawę stanu jakości powietrza poprzez ograniczenie emisji pyłu PM10 oraz działania promocyjne i edukacyjne zakładane w P. PROJEKT PRZECIWDZIAŁAŁ BĘDZIE ZJAWISKU UBÓSTWA ENERGETYCZNEGO WŚRÓD MIESZKAŃCÓW GMINY SUŁÓW. (Polish)
0 references
The project involves the installation of 353 RES installations: — 171 photovoltaic installations with a total capacity of 0.58 MW on municipal residents’ buildings (capacity: 18pcs – 2.1 kW, 61pcs. — 3.0 kW and 92pcs. — 3,9 kW), – 134 solar installations (with a total capacity of 0.467 MW) on the buildings of residents of the municipality (capacity: ), – 46 biomass kilns (with a total capacity of 0,91 MW: 16 units with a capacity of 15KW, 17 units with a capacity of 20KW, 13 units with a capacity of 25 kW) in the buildings of residents of the municipality, – 2 stoves for biomass (with a total capacity of 0.15 MW: 30 kW – building of the Health Centre in Tworyczów, and 120 kW – Remizo-Świetlice building in the city of Sułów) in public buildings, intended for CWU, CO and electricity. The project also provides for the design and execution of an online portal, which will perform educational, promotional and on-line services. TARGET GROUP: okay, okay, okay. 1600 inhabitants of the municipality of Sułów (GS). MAIN OBJECTIVE: increase the stakes. RES in GM. RES indicators: Additional ability to renew —2,1 MW; Estimated year of decline in gas. heat.(CI34) – 1394.19 t; Prod. en. electr. —521.64 MWhe/year; Prod. en. heat. —1475,48 MWhe/year. P. pursues the priority objective. 4 and main objective of the ROP PP. Complies with: SRG 2015-2020: objective 4; SRWL 2014-2020 Objectives 2.5, 3.6 and 4.5; RSI WL 2020 – smart specialisation of the region, proze WL and PZP WL – prevention of the area for the development of renewable energy. On the basis of the AIR PROGRAMME FOR the LUBLE STRESS in G., there was no exceedance of at least one limit or target level for substances subject to an air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving the air quality by reducing PM10 emissions and the promotional and educational measures envisaged in Mr PROJEKT counteract the phenomenon of the ENERGETIC BUSINESS OF THE MUSHING GUARANTEE. (English)
7 July 2021