Requalification of the Riverside Zone of Odemira – 2nd Phase (Q2863582): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Odemira / rank
 
Normal rank

Revision as of 18:44, 7 July 2021

Project Q2863582 in Portugal
Language Label Description Also known as
English
Requalification of the Riverside Zone of Odemira – 2nd Phase
Project Q2863582 in Portugal

    Statements

    0 references
    111,536.56 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    31 July 2021
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references
    0 references

    37°36'16.63"N, 8°39'53.71"W
    0 references
    Esta operação é realizada no sentido de procurar um ponto de recuperação da paisagem e de ligação entre a fase 1 do projeto, alinhando o bosque com o parque verde da fase 1, numa ampliação da superfície produtiva e transformando um espaço desabitado e quase imperceptível num espaço de lazer da Vila de Odemira. (Portuguese)
    0 references
    This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English)
    6 July 2021
    0 references
    Odemira, São Salvador e Santa Maria
    0 references

    Identifiers

    ALT20-04-2316-FEDER-000132
    0 references