(Created claim: summary (P836): Material scope: construction of oze installations (photovoltaic pcs. 2) along with wiring, monitoring and other elements of accompanying infrastructure and promotion of the project. Capacity installed in the project (2 x 498.96 kW), amount of energy generated in the project (2 x 522,00 MWh/year). The objectives of the project are in line with the strategic objectives of the development of the province and the objectives of the low-carbon economy...) |
||||||||||||||
Property / summary | |||||||||||||||
Material scope: construction of oze installations (photovoltaic pcs. 2) along with wiring, monitoring and other elements of accompanying infrastructure and promotion of the project. Capacity installed in the project (2 x 498.96 kW), amount of energy generated in the project (2 x 522,00 MWh/year). The objectives of the project are in line with the strategic objectives of the development of the province and the objectives of the low-carbon economy, including, above all, increased production of energy from renewable sources and the reduction of CO2 and other emissions of gases, increasing the level of environmental protection. The installation will be connected to the existing network of the operator. The infrastructure manager (applicant) will, under an agreement with the operator, discharge energy entirely from the installation to the grid. The aim of the project’s activities is to build installations and launch renewable energy production and reduce CO2 emissions, increase the use of RES in energy production, move towards a low-carbon economy and reduce the share of conventional energy. The objectives of the project reflect the defined needs of stakeholders and have been defined by measurable indicators in line with the objectives of the 2014-2020 ROP (output and result indicators). The implementation of the project involves the construction and operation phase (during a lifetime of 3 years from the date of final payment). The project provides emission reductions as avoided emissions (new installation) in order to achieve strategic objectives through the production of energy from renewable sources (compliant with SZOOP). The project maintains the principles of the universal design concept (to ensure that the project results are as useful as possible for all project stakeholders). The target group of the project is the applicant (user). The status of the applicant company (SMEs). The applicant entitled to receive support. Project compatible with state aid rules. (English) | |||||||||||||||
Property / summary: Material scope: construction of oze installations (photovoltaic pcs. 2) along with wiring, monitoring and other elements of accompanying infrastructure and promotion of the project. Capacity installed in the project (2 x 498.96 kW), amount of energy generated in the project (2 x 522,00 MWh/year). The objectives of the project are in line with the strategic objectives of the development of the province and the objectives of the low-carbon economy, including, above all, increased production of energy from renewable sources and the reduction of CO2 and other emissions of gases, increasing the level of environmental protection. The installation will be connected to the existing network of the operator. The infrastructure manager (applicant) will, under an agreement with the operator, discharge energy entirely from the installation to the grid. The aim of the project’s activities is to build installations and launch renewable energy production and reduce CO2 emissions, increase the use of RES in energy production, move towards a low-carbon economy and reduce the share of conventional energy. The objectives of the project reflect the defined needs of stakeholders and have been defined by measurable indicators in line with the objectives of the 2014-2020 ROP (output and result indicators). The implementation of the project involves the construction and operation phase (during a lifetime of 3 years from the date of final payment). The project provides emission reductions as avoided emissions (new installation) in order to achieve strategic objectives through the production of energy from renewable sources (compliant with SZOOP). The project maintains the principles of the universal design concept (to ensure that the project results are as useful as possible for all project stakeholders). The target group of the project is the applicant (user). The status of the applicant company (SMEs). The applicant entitled to receive support. Project compatible with state aid rules. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Material scope: construction of oze installations (photovoltaic pcs. 2) along with wiring, monitoring and other elements of accompanying infrastructure and promotion of the project. Capacity installed in the project (2 x 498.96 kW), amount of energy generated in the project (2 x 522,00 MWh/year). The objectives of the project are in line with the strategic objectives of the development of the province and the objectives of the low-carbon economy, including, above all, increased production of energy from renewable sources and the reduction of CO2 and other emissions of gases, increasing the level of environmental protection. The installation will be connected to the existing network of the operator. The infrastructure manager (applicant) will, under an agreement with the operator, discharge energy entirely from the installation to the grid. The aim of the project’s activities is to build installations and launch renewable energy production and reduce CO2 emissions, increase the use of RES in energy production, move towards a low-carbon economy and reduce the share of conventional energy. The objectives of the project reflect the defined needs of stakeholders and have been defined by measurable indicators in line with the objectives of the 2014-2020 ROP (output and result indicators). The implementation of the project involves the construction and operation phase (during a lifetime of 3 years from the date of final payment). The project provides emission reductions as avoided emissions (new installation) in order to achieve strategic objectives through the production of energy from renewable sources (compliant with SZOOP). The project maintains the principles of the universal design concept (to ensure that the project results are as useful as possible for all project stakeholders). The target group of the project is the applicant (user). The status of the applicant company (SMEs). The applicant entitled to receive support. Project compatible with state aid rules. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 18:37, 7 July 2021
Project Q2702264 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2702264 in Poland |
Statements
3,238,613.84 zloty
0 references
4,376,505.2 zloty
0 references
74.0 percent
0 references
1 April 2020
0 references
31 March 2021
0 references
EKO PRIME INWESTYCJE SPÓŁKA Z O.O.
0 references
Zakres rzeczowy: budowa instalacji oze (fotowoltaicznych szt. 2) wraz z okablowaniem, monitoringiem i innymi elementami infrastruktury towarzyszącej oraz promocja projektu. Moce zainstalowane w projekcie (2 x 498,96 kW), ilość wytworzonej energii w projekcie (2 x 522,00 MWh/rok). Cele projektu są zbieżne z celami strategicznymi rozwoju woj. oraz celami gospodarki niskoemisyjnej, w tym przede wszystkim zwiększona produkcja energii ze źródeł odnawialnych i ograniczenie emisji CO2 i innych gazów, podwyższenie poziomu ochrony środowiska. Instalacja będzie podłączona do istniejącej sieci operatora. Podmiot zarządzający infrastrukturą (wnioskodawca) na mocy umowy z operatorem będzie w całości odprowadzał energię z instalacji do sieci. Celem działań w projekcie jest budowa instalacji i uruchomienie produkcji energii ze źródeł odnawialnych i ograniczenie emisji CO2, wzrost wykorzystania OZE w produkcji energii, przejście na gospodarkę niskoemisyjną i zmniejszenie udziału energetyki konwencjonalnej. Cele projektu odzwierciedlają zdefiniowane potrzeby interesariuszy i zostały określone mierzalnymi wskaźnikami zgodnie z celami RPO WŁ 2014-2020 (wskaźniki produktu i rezultatu). Realizacja projektu obejmuje fazę budowy oraz eksploatacji (w okresie trwałości 3 lat od daty płatności końcowej). Projekt zapewnia ograniczenie emisji jako emisja uniknięta (nowa instalacja) służąc realizacji celów strategicznych poprzez produkcję energii ze źródeł odnawialnych (zgodność z SZOOP). W projekcie zachowano zasady koncepcji projektowania uniwersalnego (dbałość aby efekty projektu w jak największym stopniu były użyteczne dla wszystkich interesariuszy projektu). Grupę docelową projektu stanowi – wnioskodawca (użytkownik). Status przedsiębiorstwa wnioskodawcy (MŚP). Wnioskodawca uprawniony do otrzymania wsparcia. Projekt zgodny z zasadami pomocy publicznej. (Polish)
0 references
Material scope: construction of oze installations (photovoltaic pcs. 2) along with wiring, monitoring and other elements of accompanying infrastructure and promotion of the project. Capacity installed in the project (2 x 498.96 kW), amount of energy generated in the project (2 x 522,00 MWh/year). The objectives of the project are in line with the strategic objectives of the development of the province and the objectives of the low-carbon economy, including, above all, increased production of energy from renewable sources and the reduction of CO2 and other emissions of gases, increasing the level of environmental protection. The installation will be connected to the existing network of the operator. The infrastructure manager (applicant) will, under an agreement with the operator, discharge energy entirely from the installation to the grid. The aim of the project’s activities is to build installations and launch renewable energy production and reduce CO2 emissions, increase the use of RES in energy production, move towards a low-carbon economy and reduce the share of conventional energy. The objectives of the project reflect the defined needs of stakeholders and have been defined by measurable indicators in line with the objectives of the 2014-2020 ROP (output and result indicators). The implementation of the project involves the construction and operation phase (during a lifetime of 3 years from the date of final payment). The project provides emission reductions as avoided emissions (new installation) in order to achieve strategic objectives through the production of energy from renewable sources (compliant with SZOOP). The project maintains the principles of the universal design concept (to ensure that the project results are as useful as possible for all project stakeholders). The target group of the project is the applicant (user). The status of the applicant company (SMEs). The applicant entitled to receive support. Project compatible with state aid rules. (English)
7 July 2021
0 references
Identifiers
RPLD.04.01.02-10-0096/18
0 references