U21 — Construction of training areas for health and technical study programmes (Q20174): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): Project U21 — RESTAV is the construction of new training areas for the Faculty of Health Studies (FZS) and the Faculty of Mechanical Engineering (FSI). The FSI shall be located in the campus and be connected to the existing building of the faculty. The object of the FZS will be located at the Masaryk Hospital site in Ústí nad Labem. The project is complementary to the ESF project U21 — A University responding to the problems of the NWW Region (U...)
Property / summary
 
Project U21 — RESTAV is the construction of new training areas for the Faculty of Health Studies (FZS) and the Faculty of Mechanical Engineering (FSI). The FSI shall be located in the campus and be connected to the existing building of the faculty. The object of the FZS will be located at the Masaryk Hospital site in Ústí nad Labem. The project is complementary to the ESF project U21 — A University responding to the problems of the NWW Region (U21-RETROREG). (English)
Property / summary: Project U21 — RESTAV is the construction of new training areas for the Faculty of Health Studies (FZS) and the Faculty of Mechanical Engineering (FSI). The FSI shall be located in the campus and be connected to the existing building of the faculty. The object of the FZS will be located at the Masaryk Hospital site in Ústí nad Labem. The project is complementary to the ESF project U21 — A University responding to the problems of the NWW Region (U21-RETROREG). (English) / rank
 
Normal rank

Revision as of 13:05, 25 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
U21 — Construction of training areas for health and technical study programmes
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    592,769,455.94 Czech koruna
    0 references
    23,710,778.237600002 Euro
    10 January 2020
    0 references
    697,375,830.52 Czech koruna
    0 references
    27,895,033.2208 Euro
    10 January 2020
    0 references
    84.9999999997132 percent
    0 references
    1 January 2019
    0 references
    31 December 2021
    0 references
    Univerzita Jana Evangelisty Purkyně v Ústí nad Labem
    0 references

    50°39'55.80"N, 14°1'17.54"E
    0 references
    40001
    0 references
    Projekt U21 - RESTAV je výstavba nových výukových prostor pro Fakultu zdravotnických studií (FZS) a Fakultu strojního inženýrství (FSI). Objekt FSI bude umístěn v kampusu a propojen lávkou se stávající budovou fakulty. Objekt FZS bude umístěn v areálu Masarykovy nemocnice v Ústí nad Labem. Projekt je komplementární k ESF projektu U21 - Univerzita reflektující problémy regionu severozápadních Čech (U21 - REPROREG). a. (Czech)
    0 references
    Project U21 — RESTAV is the construction of new training areas for the Faculty of Health Studies (FZS) and the Faculty of Mechanical Engineering (FSI). The FSI shall be located in the campus and be connected to the existing building of the faculty. The object of the FZS will be located at the Masaryk Hospital site in Ústí nad Labem. The project is complementary to the ESF project U21 — A University responding to the problems of the NWW Region (U21-RETROREG). (English)
    0 references

    Identifiers

    CZ.02.2.67/0.0/0.0/18_059/0010209
    0 references