Q2699378 (Q2699378): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The object of the investment is the implementation of the new ground floor building of the Centre for Water Sports on Lake Żniński Mały at ul. School 12 in Żnin, together with the development of plot No 849/1 (about 0,36 ha), the development of an urban beach on plot No 849/5 and the establishment of a bathing area on plot 840/3. The planned construction project is planned to be carried out on the site of the “old” WOPR building for demolition d...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the investment is the implementation of the new ground floor building of the Centre for Water Sports on Lake Żniński Mały at ul. School 12 in Żnin, together with the development of plot No 849/1 (about 0,36 ha), the development of an urban beach on plot No 849/5 and the establishment of a bathing area on plot 840/3. The planned construction project is planned to be carried out on the site of the “old” WOPR building for demolition due to its poor technical condition (including wetness, fungi, cracking, etc.). An appropriate demolition project has already been carried out.A new service building of the Water Sports Centre with the function of sports, tourist and recreational activation and directly related to the service of the city beach of J. Å1⁄4ński Małego has been designed on plot 849/1. The building was designed precisely in the location specified by the MPZP. The area of use of the new building will be 631 m². The designed rooms include:• the team of water tourism activation,• the changing room and toilet team associated with the service of beachmakers,• the warehouse team,• the administrative and economic team associated with the building. As part of the project, the surroundings of the building will be developed within the plot. There will be a place for camping together with a place for a bonfire or barbecue, an internal car park for 32 passenger cars, access and pavements will be rebuilt, the area will gain new planting. A permanent swimming pool will be created on plot No 840/3, which is a land covered with water and is owned by the State Treasury, as well as a developed city beach. i.e. furniture, rescue equipment, multimedia equipment, kitchen equipment, as well as tourist, sports and recreational equipment used by beach visitors. The infrastructure created as a result of the project will be operated by the Municipal Sports Centre in Żnin, which is a municipal budget unit. (English) | |||||||||||||||
Property / summary: The object of the investment is the implementation of the new ground floor building of the Centre for Water Sports on Lake Żniński Mały at ul. School 12 in Żnin, together with the development of plot No 849/1 (about 0,36 ha), the development of an urban beach on plot No 849/5 and the establishment of a bathing area on plot 840/3. The planned construction project is planned to be carried out on the site of the “old” WOPR building for demolition due to its poor technical condition (including wetness, fungi, cracking, etc.). An appropriate demolition project has already been carried out.A new service building of the Water Sports Centre with the function of sports, tourist and recreational activation and directly related to the service of the city beach of J. Å1⁄4ński Małego has been designed on plot 849/1. The building was designed precisely in the location specified by the MPZP. The area of use of the new building will be 631 m². The designed rooms include:• the team of water tourism activation,• the changing room and toilet team associated with the service of beachmakers,• the warehouse team,• the administrative and economic team associated with the building. As part of the project, the surroundings of the building will be developed within the plot. There will be a place for camping together with a place for a bonfire or barbecue, an internal car park for 32 passenger cars, access and pavements will be rebuilt, the area will gain new planting. A permanent swimming pool will be created on plot No 840/3, which is a land covered with water and is owned by the State Treasury, as well as a developed city beach. i.e. furniture, rescue equipment, multimedia equipment, kitchen equipment, as well as tourist, sports and recreational equipment used by beach visitors. The infrastructure created as a result of the project will be operated by the Municipal Sports Centre in Żnin, which is a municipal budget unit. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the investment is the implementation of the new ground floor building of the Centre for Water Sports on Lake Żniński Mały at ul. School 12 in Żnin, together with the development of plot No 849/1 (about 0,36 ha), the development of an urban beach on plot No 849/5 and the establishment of a bathing area on plot 840/3. The planned construction project is planned to be carried out on the site of the “old” WOPR building for demolition due to its poor technical condition (including wetness, fungi, cracking, etc.). An appropriate demolition project has already been carried out.A new service building of the Water Sports Centre with the function of sports, tourist and recreational activation and directly related to the service of the city beach of J. Å1⁄4ński Małego has been designed on plot 849/1. The building was designed precisely in the location specified by the MPZP. The area of use of the new building will be 631 m². The designed rooms include:• the team of water tourism activation,• the changing room and toilet team associated with the service of beachmakers,• the warehouse team,• the administrative and economic team associated with the building. As part of the project, the surroundings of the building will be developed within the plot. There will be a place for camping together with a place for a bonfire or barbecue, an internal car park for 32 passenger cars, access and pavements will be rebuilt, the area will gain new planting. A permanent swimming pool will be created on plot No 840/3, which is a land covered with water and is owned by the State Treasury, as well as a developed city beach. i.e. furniture, rescue equipment, multimedia equipment, kitchen equipment, as well as tourist, sports and recreational equipment used by beach visitors. The infrastructure created as a result of the project will be operated by the Municipal Sports Centre in Żnin, which is a municipal budget unit. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 17:24, 7 July 2021
Project Q2699378 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2699378 in Poland |
Statements
3,114,910.79 zloty
0 references
3,893,638.5 zloty
0 references
80.0 percent
0 references
1 May 2019
0 references
30 June 2021
0 references
GMINA ŻNIN
0 references
Przedmiotem inwestycji jest realizacja nowego parterowego budynku Centrum Sportów Wodnych nad Jeziorem Żnińskim Małym przy ul. Szkolnej 12 w Żninie wraz z zagospodarowaniem działki nr 849/1 (o pow. 0,36 ha), zagospodarowanie plaży miejskiej na działce nr 849/5 oraz utworzenie kąpieliska na działce 840/3. Projektowana inwestycja budowy planowana jest do realizacji w miejscu „starego“ budynku WOPR przeznaczonego do rozbiórki z uwagi na jego zły stan techniczny (m. in. zamoknięcia, zagrzybienia, spękania itd.). Wykonano już stosowny projekt rozbiórki.Na działce 849/1 zaprojektowano nowy budynek usługowy Centrum Sportów Wodnych o funkcji aktywizacji sportowej, turystycznej i rekreacyjnej, a także związanej bezpośrednio z obsługą plaży miejskiej J. Żnińskiego Małego. Budynek zaprojektowano dokładnie w miejscu określonym przez MPZP. Powierzchnia użytk. nowego budynku wyniesie 631 m2. Projektowane pomieszczenia obejmują:• zespół aktywizacji turystyki wodnej,• zespół przebieralniowo-toaletowy związany z obsługą plażowiczów,• zespół magazynowy,• zespół administracyjno-gospodarczy związany z budynkiem.W ramach projektu zostanie zagospodarowana okolica budynku w obrębie działki. Powstanie m. in. miejsce dla możliwego biwakowania wraz z miejscem na ognisko lub grilla, wewnętrzny parking dla 32 samochodów osobowych, zostanie przebudowany dojazd i chodniki, teren zyska nowe nasadzenia roślin.Zostanie utworzone stałe kąpielisko na działce nr 840/3, która jest gruntem pokrytym wodą i stanowi własność Skarbu Państwa, a także zagospodarowana plaża miejska.W ramach projektu zostanie zakupione niezbędne wyposażenie pomieszczeń, tj. meble, sprzęt ratowniczy, sprzęt multimedialny, wyposażenie kuchni, a także sprzęt turystyczny, sportowy i rekreacyjny wykorzystywany przez odwiedzających plażę.Operatorem powstałej w wyniku realizacji projektu infrastruktury będzie Miejski Ośrodek Sportu w Żninie, który jest gminną jednostką budżetową. (Polish)
0 references
The object of the investment is the implementation of the new ground floor building of the Centre for Water Sports on Lake Żniński Mały at ul. School 12 in Żnin, together with the development of plot No 849/1 (about 0,36 ha), the development of an urban beach on plot No 849/5 and the establishment of a bathing area on plot 840/3. The planned construction project is planned to be carried out on the site of the “old” WOPR building for demolition due to its poor technical condition (including wetness, fungi, cracking, etc.). An appropriate demolition project has already been carried out.A new service building of the Water Sports Centre with the function of sports, tourist and recreational activation and directly related to the service of the city beach of J. Å1⁄4ński Małego has been designed on plot 849/1. The building was designed precisely in the location specified by the MPZP. The area of use of the new building will be 631 m². The designed rooms include:• the team of water tourism activation,• the changing room and toilet team associated with the service of beachmakers,• the warehouse team,• the administrative and economic team associated with the building. As part of the project, the surroundings of the building will be developed within the plot. There will be a place for camping together with a place for a bonfire or barbecue, an internal car park for 32 passenger cars, access and pavements will be rebuilt, the area will gain new planting. A permanent swimming pool will be created on plot No 840/3, which is a land covered with water and is owned by the State Treasury, as well as a developed city beach. i.e. furniture, rescue equipment, multimedia equipment, kitchen equipment, as well as tourist, sports and recreational equipment used by beach visitors. The infrastructure created as a result of the project will be operated by the Municipal Sports Centre in Żnin, which is a municipal budget unit. (English)
7 July 2021
0 references
Identifiers
RPKP.06.05.00-04-0007/19
0 references