Q2699208 (Q2699208): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project consists of the construction of a bicycle path from the intersection with the national road no. 25 to Bożenkowa. It will connect with the already existing cycle path along the national road no. 25 (road from Bydgoszcz to Koronowo) and to the built cycle path along district roads 1525C and 1526C. The end of the section covered by the project connects with the existing cycle path located at the S5 expressway junction in Maksymilianów....)
Property / summary
 
The project consists of the construction of a bicycle path from the intersection with the national road no. 25 to Bożenkowa. It will connect with the already existing cycle path along the national road no. 25 (road from Bydgoszcz to Koronowo) and to the built cycle path along district roads 1525C and 1526C. The end of the section covered by the project connects with the existing cycle path located at the S5 expressway junction in Maksymilianów. The construction of a cycle path will complement the existing infrastructure of cycle paths in the district of Bydgoszcz. The built cycle path will connect Osielsko commune with Koronów and Bydgoszcz via the cycle path, which will contribute to the increased use of bicycles as a means of communication by residents of Bydgoszcz and Bydgoszcz districts. (English)
Property / summary: The project consists of the construction of a bicycle path from the intersection with the national road no. 25 to Bożenkowa. It will connect with the already existing cycle path along the national road no. 25 (road from Bydgoszcz to Koronowo) and to the built cycle path along district roads 1525C and 1526C. The end of the section covered by the project connects with the existing cycle path located at the S5 expressway junction in Maksymilianów. The construction of a cycle path will complement the existing infrastructure of cycle paths in the district of Bydgoszcz. The built cycle path will connect Osielsko commune with Koronów and Bydgoszcz via the cycle path, which will contribute to the increased use of bicycles as a means of communication by residents of Bydgoszcz and Bydgoszcz districts. (English) / rank
 
Normal rank
Property / summary: The project consists of the construction of a bicycle path from the intersection with the national road no. 25 to Bożenkowa. It will connect with the already existing cycle path along the national road no. 25 (road from Bydgoszcz to Koronowo) and to the built cycle path along district roads 1525C and 1526C. The end of the section covered by the project connects with the existing cycle path located at the S5 expressway junction in Maksymilianów. The construction of a cycle path will complement the existing infrastructure of cycle paths in the district of Bydgoszcz. The built cycle path will connect Osielsko commune with Koronów and Bydgoszcz via the cycle path, which will contribute to the increased use of bicycles as a means of communication by residents of Bydgoszcz and Bydgoszcz districts. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:21, 7 July 2021

Project Q2699208 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699208 in Poland

    Statements

    0 references
    2,555,634.32 zloty
    0 references
    568,117.51 Euro
    0.2223 Euro
    0 references
    3,354,291.02 zloty
    0 references
    745,658.89 Euro
    0.2223 Euro
    0 references
    76.19 percent
    0 references
    22 June 2017
    0 references
    31 December 2021
    0 references
    POWIAT BYDGOSKI
    0 references
    Q2520192 (Deleted Item)
    0 references

    53°18'50.8"N, 17°56'13.2"E
    0 references

    53°11'10.7"N, 18°4'37.2"E
    0 references

    53°12'14.0"N, 17°48'1.8"E
    0 references

    53°7'46.9"N, 18°1'45.8"E
    0 references
    Projekt polega na budowie ścieżki rowerowej od skrzyżowania z drogą krajową nr 25 do Bożenkowa. Połączy się ona z istniejącą już ścieżką rowerową wzdłuż drogi krajowej nr 25 (trasa z Bydgoszczy do Koronowa) i z budowaną ścieżką rowerową wzdłuż dróg powiatowych nr 1525C i 1526C. Koniec odcinka objętego projektem łączy się z istniejącą ścieżką rowerową znajdującą się przy węźle drogi ekspresowej S5 w Maksymilianowie. Budowa ścieżki rowerowej uzupełni istniejącą już w województwie infrastrukturę ścieżek rowerowych na terenie powiatu bydgoskiego. Budowana ścieżka rowerowa połączy za pomocą ścieżki rowerowej gminę Osielsko z Koronowem i Bydgoszczą, co przyczyni się do większego wykorzystania rowerów, jako środka komunikacji przez mieszkańców powiatu bydgoskiego i Bydgoszczy. (Polish)
    0 references
    The project consists of the construction of a bicycle path from the intersection with the national road no. 25 to Bożenkowa. It will connect with the already existing cycle path along the national road no. 25 (road from Bydgoszcz to Koronowo) and to the built cycle path along district roads 1525C and 1526C. The end of the section covered by the project connects with the existing cycle path located at the S5 expressway junction in Maksymilianów. The construction of a cycle path will complement the existing infrastructure of cycle paths in the district of Bydgoszcz. The built cycle path will connect Osielsko commune with Koronów and Bydgoszcz via the cycle path, which will contribute to the increased use of bicycles as a means of communication by residents of Bydgoszcz and Bydgoszcz districts. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.03.05.02-04-0007/19
    0 references