Q2699154 (Q2699154): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The main objective of the project is the development of local cycling infrastructure contributing to the improvement of the level of safety. The project involves the construction of the second stage of the cycle path in Golub-Dobrzyń with a length of 245 m, along the provincial road no. 554 between Orzechowo and Sierakowo – Kowalewo Pomorskie – Golub Dobrzyń – Kikół, from the intersection with the municipal road no. 110642C, i.e. ul. Świerkowa t...)
Property / summary
 
The main objective of the project is the development of local cycling infrastructure contributing to the improvement of the level of safety. The project involves the construction of the second stage of the cycle path in Golub-Dobrzyń with a length of 245 m, along the provincial road no. 554 between Orzechowo and Sierakowo – Kowalewo Pomorskie – Golub Dobrzyń – Kikół, from the intersection with the municipal road no. 110642C, i.e. ul. Świerkowa to the intersection with municipal road No 1106060C – ul. Cisowa, with the following parameters: — The width of the cycle path 2,0 m,- The groundside of the variable width.- Path limited from the side of the road with concrete curb and on the side of the opposite concrete edge,- Surface in the place of asphalt concrete slides + chemoutset weight in red, on the remaining length of asphalt concrete.- The bike path will not be equipped with installations.- The path runs on the ground, earthworks include only troughing and alignment of the bottom of the trough under construction layers. The path nivelet was raised on average by 10 cm above the existing terrain.- The longitudinal slope of the path does not exceed 5 %, which ensures the safety of the movement of cyclists.- The discharge of rainwater will occur surface to the ground within the boundaries of the plots. The amount of water discharged will not exceed the absorbency of the ground.Bezie path located on plots 145, 159 and 181 area 6 of the City of Golubia-Dobrzynia. Currently, the existing cycle path ends at the intersection with Cisowa Street. Extension of its race to the intersection with ul. Świerkowa will make life easier for residents of the area and will improve the safety of all road users – not only cyclists, but also drivers and pedestrians. (English)
Property / summary: The main objective of the project is the development of local cycling infrastructure contributing to the improvement of the level of safety. The project involves the construction of the second stage of the cycle path in Golub-Dobrzyń with a length of 245 m, along the provincial road no. 554 between Orzechowo and Sierakowo – Kowalewo Pomorskie – Golub Dobrzyń – Kikół, from the intersection with the municipal road no. 110642C, i.e. ul. Świerkowa to the intersection with municipal road No 1106060C – ul. Cisowa, with the following parameters: — The width of the cycle path 2,0 m,- The groundside of the variable width.- Path limited from the side of the road with concrete curb and on the side of the opposite concrete edge,- Surface in the place of asphalt concrete slides + chemoutset weight in red, on the remaining length of asphalt concrete.- The bike path will not be equipped with installations.- The path runs on the ground, earthworks include only troughing and alignment of the bottom of the trough under construction layers. The path nivelet was raised on average by 10 cm above the existing terrain.- The longitudinal slope of the path does not exceed 5 %, which ensures the safety of the movement of cyclists.- The discharge of rainwater will occur surface to the ground within the boundaries of the plots. The amount of water discharged will not exceed the absorbency of the ground.Bezie path located on plots 145, 159 and 181 area 6 of the City of Golubia-Dobrzynia. Currently, the existing cycle path ends at the intersection with Cisowa Street. Extension of its race to the intersection with ul. Świerkowa will make life easier for residents of the area and will improve the safety of all road users – not only cyclists, but also drivers and pedestrians. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is the development of local cycling infrastructure contributing to the improvement of the level of safety. The project involves the construction of the second stage of the cycle path in Golub-Dobrzyń with a length of 245 m, along the provincial road no. 554 between Orzechowo and Sierakowo – Kowalewo Pomorskie – Golub Dobrzyń – Kikół, from the intersection with the municipal road no. 110642C, i.e. ul. Świerkowa to the intersection with municipal road No 1106060C – ul. Cisowa, with the following parameters: — The width of the cycle path 2,0 m,- The groundside of the variable width.- Path limited from the side of the road with concrete curb and on the side of the opposite concrete edge,- Surface in the place of asphalt concrete slides + chemoutset weight in red, on the remaining length of asphalt concrete.- The bike path will not be equipped with installations.- The path runs on the ground, earthworks include only troughing and alignment of the bottom of the trough under construction layers. The path nivelet was raised on average by 10 cm above the existing terrain.- The longitudinal slope of the path does not exceed 5 %, which ensures the safety of the movement of cyclists.- The discharge of rainwater will occur surface to the ground within the boundaries of the plots. The amount of water discharged will not exceed the absorbency of the ground.Bezie path located on plots 145, 159 and 181 area 6 of the City of Golubia-Dobrzynia. Currently, the existing cycle path ends at the intersection with Cisowa Street. Extension of its race to the intersection with ul. Świerkowa will make life easier for residents of the area and will improve the safety of all road users – not only cyclists, but also drivers and pedestrians. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:20, 7 July 2021

Project Q2699154 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699154 in Poland

    Statements

    0 references
    92,545.19 zloty
    0 references
    20,572.8 Euro
    0.2223 Euro
    0 references
    108,876.7 zloty
    0 references
    24,203.29 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 October 2020
    0 references
    30 September 2021
    0 references
    GMINA MIASTO GOLUB-DOBRZYŃ
    0 references
    0 references

    53°6'44.3"N, 19°3'26.3"E
    0 references
    Głównym celem projektu jest rozwój lokalnej infrastruktury rowerowej przyczyniający się do podniesienia poziomu bezpieczeństwa. Projekt zakłada budowę II etapu ścieżki rowerowej w miejscowości Golub-Dobrzyń o długości 245m, wzdłuż drogi wojewódzkiej nr 554 relacji Orzechowo – Sierakowo – Kowalewo Pomorskie – Golub Dobrzyń – Kikół, od skrzyżowania z drogą gminną nr 110642C tj. ul. Świerkową do skrzyżowania z drogą gminną nr 1106060C - ul. Cisowa, o następujących parametrach: - Szerokość ścieżki rowerowej 2,0m,- Pobocze gruntowe zmiennej szerokości.- Ścieżka ograniczona od strony drogi krawężnikiem betonowym i ze strony przeciwnej obrzeżem betonowym,- Nawierzchnia w miejscu zjazdów z betonu asfaltowego +masa chemoutwardzalna w kolorze czerwonym, na pozostałej długości z betonu asfaltowego.- Ścieżka rowerowa nie będzie wyposażona w instalacje.- Ścieżka przebiega po terenie, roboty ziemne obejmują jedynie korytowanie i wyrównanie dna koryta pod warstwy konstrukcyjne. Niweletę ścieżki podniesiono średnio o 10 cm nad istniejący teren.- Pochylenie podłużne ścieżki nie przekracza 5%, co zapewnia bezpieczeństwo ruchu rowerzystów.- Odprowadzenie wód opadowych nastąpi powierzchniowo do gruntu w granicach działek. Ilość odprowadzonych wód nie przekroczy chłonności gruntu.Ścieżka bezie zlokalizowana na działkach nr 145, 159 oraz 181 obręb 6 Miasta Golubia-Dobrzynia. Obecnie istniejąca ścieżka rowerowa kończy się na skrzyżowaniu z ulicą Cisową. Przedłużenie jej biegu do skrzyżowania z ul. Świerkową ułatwi życie mieszkańcom okolicy oraz wpłynie na poprawę bezpieczeństwa wszystkich uczestników ruchu drogowego – nie tylko rowerzystów, ale także kierowców i pieszych. (Polish)
    0 references
    The main objective of the project is the development of local cycling infrastructure contributing to the improvement of the level of safety. The project involves the construction of the second stage of the cycle path in Golub-Dobrzyń with a length of 245 m, along the provincial road no. 554 between Orzechowo and Sierakowo – Kowalewo Pomorskie – Golub Dobrzyń – Kikół, from the intersection with the municipal road no. 110642C, i.e. ul. Świerkowa to the intersection with municipal road No 1106060C – ul. Cisowa, with the following parameters: — The width of the cycle path 2,0 m,- The groundside of the variable width.- Path limited from the side of the road with concrete curb and on the side of the opposite concrete edge,- Surface in the place of asphalt concrete slides + chemoutset weight in red, on the remaining length of asphalt concrete.- The bike path will not be equipped with installations.- The path runs on the ground, earthworks include only troughing and alignment of the bottom of the trough under construction layers. The path nivelet was raised on average by 10 cm above the existing terrain.- The longitudinal slope of the path does not exceed 5 %, which ensures the safety of the movement of cyclists.- The discharge of rainwater will occur surface to the ground within the boundaries of the plots. The amount of water discharged will not exceed the absorbency of the ground.Bezie path located on plots 145, 159 and 181 area 6 of the City of Golubia-Dobrzynia. Currently, the existing cycle path ends at the intersection with Cisowa Street. Extension of its race to the intersection with ul. Świerkowa will make life easier for residents of the area and will improve the safety of all road users – not only cyclists, but also drivers and pedestrians. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.03.04.00-04-0007/20
    0 references