Implementing measures to improve the reliability, information and uptake of the balance sheet and optimising traffic in the local energy-producing local distribution system. (Q18632): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is compleme...) |
||
Property / summary | |||
The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is complemented by a new remotely controlled opening and monitoring elements. (English) | |||
Property / summary: The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is complemented by a new remotely controlled opening and monitoring elements. (English) / rank | |||
Normal rank |
Revision as of 13:02, 25 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementing measures to improve the reliability, information and uptake of the balance sheet and optimising traffic in the local energy-producing local distribution system. |
Project in Czech Republic financed by DG Regio |
Statements
4,178,851.44 Czech koruna
0 references
10,447,128.6 Czech koruna
0 references
40 percent
0 references
30 September 2017
0 references
15 June 2021
0 references
ENERGO KD s.r.o.
0 references
26701
0 references
V rámci projektu bude implementován celý komplex opatření implementace inteligentních prvků v lokální distribuční soustavě ENERGO KD. Hlavními oblastmi implementace jsou vybudování nového datového bilančního centra navázaného na inteligentní systém měření s doplněním o mnoho dalších technologických funkcionalit. Druhou významnou oblastí je modernizace dispečerského a operativního řízení soustavy, které je doplněno o nové dálkově řízené spínací a monitorovací prvky. a. (Czech)
0 references
The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is complemented by a new remotely controlled opening and monitoring elements. (English)
0 references
Identifiers
CZ.01.3.12/0.0/0.0/16_062/0011432
0 references