Q2883678 (Q2883678): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets (English) | |||||||||||||||
Property / summary: The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 12:32, 7 July 2021
Project Q2883678 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2883678 in Portugal |
Statements
41,213,398.81 Euro
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2020
0 references
SECRETARIA REGIONAL DE EQUIPAMENTOS E INFRAESTRUTURAS
0 references
A infraestrutura rodoviária, com 2,5km de extensão, inclui a execução dos seguintes trabalhos: 2,498 Km de plena via 2 Túneis unidireccionais, um de 330m e outro de 390m 5 Viadutos, numa extensão total de 871m 8 Obras de arte Correntes (PI, PS, PA e PP) numa extensão acumulada de 360 m 7 Restabelecimentos à rede viária existente 3 Rotundas 3 Arruamentos de ligação (Portuguese)
0 references
The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets (English)
7 July 2021
0 references
Câmara de Lobos, Câmara de Lobos
0 references
Identifiers
M1420-06-2756-FEDER-000002
0 references