Q2882325 (Q2882325): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The intervention area corresponds, in a certain way, to a sub-unit of the built complex, since it is physically separated from the prison area by the wall that constitutes the path of guarding. Buildings 1 and 3 will be refurbished, building 2 will be partially demolished and the outer spaces will be treated. The fence will be opened, creating a square that will connect the front of buildings to the outside., translated_summary)
Property / summary
 
The intervention area corresponds, in a certain way, to a sub-unit of the built complex, since it is physically separated from the prison area by the wall that constitutes the path of guarding. Buildings 1 and 3 will be refurbished, building 2 will be partially demolished and the outer spaces will be treated. The fence will be opened, creating a square that will connect the front of buildings to the outside. (English)
Property / summary: The intervention area corresponds, in a certain way, to a sub-unit of the built complex, since it is physically separated from the prison area by the wall that constitutes the path of guarding. Buildings 1 and 3 will be refurbished, building 2 will be partially demolished and the outer spaces will be treated. The fence will be opened, creating a square that will connect the front of buildings to the outside. (English) / rank
 
Normal rank
Property / summary: The intervention area corresponds, in a certain way, to a sub-unit of the built complex, since it is physically separated from the prison area by the wall that constitutes the path of guarding. Buildings 1 and 3 will be refurbished, building 2 will be partially demolished and the outer spaces will be treated. The fence will be opened, creating a square that will connect the front of buildings to the outside. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:52, 7 July 2021

Project Q2882325 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2882325 in Portugal

    Statements

    0 references
    423,370.34 Euro
    0 references
    50.0 percent
    0 references
    28 April 2017
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE ALMADA
    0 references

    38°39'13.25"N, 9°13'1.13"W
    0 references
    A área de intervenção corresponde, de certa forma, a uma sub-unidade do complexo edificado, uma vez que se encontra fisicamente separado da zona prisional pelo muro que constitui o caminho de guarda. Os edifícios 1 e 3 serão objeto de reconversão, o edifício 2 de demolição parcial e assegurar-se-á, ainda o tratamento dos espaços exteriores. Será aberta a vedação, criando-se uma praça que ligará a frente de edifícios ao exterior. (Portuguese)
    0 references
    The intervention area corresponds, in a certain way, to a sub-unit of the built complex, since it is physically separated from the prison area by the wall that constitutes the path of guarding. Buildings 1 and 3 will be refurbished, building 2 will be partially demolished and the outer spaces will be treated. The fence will be opened, creating a square that will connect the front of buildings to the outside. (English)
    7 July 2021
    0 references
    Almada, União das freguesias de Caparica e Trafaria
    0 references

    Identifiers

    LISBOA-08-4943-FEDER-000028
    0 references