Q2882066 (Q2882066): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): With this operation it is intended to equip the building of the Quinta Nova da Telha Basic School with new roofs, rebuilding them with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias do Alto do Seixalinho, Santo André and Verderena, in the municipality of Barreiro., tran...)
Property / summary
 
With this operation it is intended to equip the building of the Quinta Nova da Telha Basic School with new roofs, rebuilding them with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias do Alto do Seixalinho, Santo André and Verderena, in the municipality of Barreiro. (English)
Property / summary: With this operation it is intended to equip the building of the Quinta Nova da Telha Basic School with new roofs, rebuilding them with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias do Alto do Seixalinho, Santo André and Verderena, in the municipality of Barreiro. (English) / rank
 
Normal rank
Property / summary: With this operation it is intended to equip the building of the Quinta Nova da Telha Basic School with new roofs, rebuilding them with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias do Alto do Seixalinho, Santo André and Verderena, in the municipality of Barreiro. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:41, 7 July 2021

Project Q2882066 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2882066 in Portugal

    Statements

    0 references
    384,169.5 Euro
    0 references
    50.0 percent
    0 references
    1 July 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DO BARREIRO
    0 references

    38°39'35.03"N, 9°4'17.94"W
    0 references
    Com esta operação pretende-se dotar o edifício da Escola Básica Quinta Nova da Telha com novas coberturas, reconstruindo-as com novos materiais que promovam ao edificado, um maior conforto térmico e melhores condições de estanquidade, contribuindo deste modo, para o aumento da taxa de cobertura da requalificação das escolas do ensino básico na União de Freguesias do Alto do Seixalinho, Santo André e Verderena, no concelho do Barreiro. (Portuguese)
    0 references
    With this operation it is intended to equip the building of the Quinta Nova da Telha Basic School with new roofs, rebuilding them with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias do Alto do Seixalinho, Santo André and Verderena, in the municipality of Barreiro. (English)
    7 July 2021
    0 references
    Barreiro, União das freguesias de Alto do Seixalinho, Santo André e Verderena
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000196
    0 references