Q2878129 (Q2878129): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and roa...)
Property / summary
 
With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English)
Property / summary: With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English) / rank
 
Normal rank
Property / summary: With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:55, 7 July 2021

Project Q2878129 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2878129 in Portugal

    Statements

    0 references
    105,756.79 Euro
    0 references
    85.0 percent
    0 references
    22 May 2015
    0 references
    31 July 2016
    0 references
    MUNICIPIO DE CASTELO BRANCO
    0 references

    39°49'35.87"N, 7°29'30.95"W
    0 references
    Com a presente operação, pretende-se proceder à construção da ligação pedonal entre a zona sul da cidade, no início da Avenida Professor Dr. Egas Moniz, e a zona industrial, numa extensão cerca de 563 metros, de forma a dar continuidade aos passeios existentes junto às edificações e acessos, garantindo assim o acesso pedonal à zona industrial em melhores condições de circulação e segurança por parte dos peões e do trânsito rodoviário. (Portuguese)
    0 references
    With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English)
    7 July 2021
    0 references
    Castelo Branco, Castelo Branco
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000001
    0 references