Q2878129 (Q2878129): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and roa...) |
||||||||||||||
Property / summary | |||||||||||||||
With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English) | |||||||||||||||
Property / summary: With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 09:55, 7 July 2021
Project Q2878129 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2878129 in Portugal |
Statements
105,756.79 Euro
0 references
85.0 percent
0 references
22 May 2015
0 references
31 July 2016
0 references
MUNICIPIO DE CASTELO BRANCO
0 references
Com a presente operação, pretende-se proceder à construção da ligação pedonal entre a zona sul da cidade, no início da Avenida Professor Dr. Egas Moniz, e a zona industrial, numa extensão cerca de 563 metros, de forma a dar continuidade aos passeios existentes junto às edificações e acessos, garantindo assim o acesso pedonal à zona industrial em melhores condições de circulação e segurança por parte dos peões e do trânsito rodoviário. (Portuguese)
0 references
With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and road traffic. (English)
7 July 2021
0 references
Castelo Branco, Castelo Branco
0 references
Identifiers
CENTRO-09-1406-FEDER-000001
0 references