Q2877366 (Q2877366): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): This application has as general objective the implementation of solutions that allow the reduction of energy consumption and consequent reduction of emissions and municipal electricity bills in the municipal complex of swimming pools. The recommended solutions should motivate a positive impact on the energy class of the building at two levels, i.e. the final energy class should be B-, compared to the current energy class D., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This application has as general objective the implementation of solutions that allow the reduction of energy consumption and consequent reduction of emissions and municipal electricity bills in the municipal complex of swimming pools. The recommended solutions should motivate a positive impact on the energy class of the building at two levels, i.e. the final energy class should be B-, compared to the current energy class D. (English) | |||||||||||||||
Property / summary: This application has as general objective the implementation of solutions that allow the reduction of energy consumption and consequent reduction of emissions and municipal electricity bills in the municipal complex of swimming pools. The recommended solutions should motivate a positive impact on the energy class of the building at two levels, i.e. the final energy class should be B-, compared to the current energy class D. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This application has as general objective the implementation of solutions that allow the reduction of energy consumption and consequent reduction of emissions and municipal electricity bills in the municipal complex of swimming pools. The recommended solutions should motivate a positive impact on the energy class of the building at two levels, i.e. the final energy class should be B-, compared to the current energy class D. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 09:37, 7 July 2021
Project Q2877366 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2877366 in Portugal |
Statements
175,837.48 Euro
0 references
85.0 percent
0 references
2 January 2019
0 references
31 December 2019
0 references
MUNICÍPIO DE VILA NOVA DA BARQUINHA
0 references
A presente candidatura tem como objetivo geral a implementação de soluções que permitem a redução do consumo energético e consequente redução de emissões e fatura de energia elétrica municipal no complexo municipal de piscinas. As soluções preconizadas devem motivar um impacto positivo na classe energética do edifício em dois níveis, isto é a classe energética final deverá ser B-, face à atual classe energética D. (Portuguese)
0 references
This application has as general objective the implementation of solutions that allow the reduction of energy consumption and consequent reduction of emissions and municipal electricity bills in the municipal complex of swimming pools. The recommended solutions should motivate a positive impact on the energy class of the building at two levels, i.e. the final energy class should be B-, compared to the current energy class D. (English)
7 July 2021
0 references
Vila Nova da Barquinha, Vila Nova da Barquinha
0 references
Identifiers
CENTRO-06-1203-FEDER-000010
0 references