Basic School of Santa Iria_Tomar (Q2871094): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The present operation aims to replace the roofs of the buildings that are part of the Basic School of Santa Iria, coverings that are made of asbestos cement sheet in its composition, with a sandwich panel covering 50 mm thick. Given the risks posed by asbestos to public health, the proposed intervention is a priority, responding to a concern of the school community., translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Basic School of Santa Iria_Tomar |
Revision as of 08:40, 7 July 2021
Project Q2871094 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Basic School of Santa Iria_Tomar |
Project Q2871094 in Portugal |
Statements
122,813.99 Euro
0 references
85.0 percent
0 references
25 January 2021
0 references
31 December 2021
0 references
MUNICÍPIO DE TOMAR
0 references
A presente operação visa a substituição das coberturas dos edifícios que integram a Escola Básica de Santa Iria, coberturas essas que são em chapa de fibrocimento contendo amianto na sua composição, por uma cobertura de painel sandwich com 50mm de espessura. Face aos riscos que o amianto representa para a saúde pública a intervenção proposta assume-se como prioritária, respondendo a uma preocupação da comunidade escolar. (Portuguese)
0 references
The present operation aims to replace the roofs of the buildings that are part of the Basic School of Santa Iria, coverings that are made of asbestos cement sheet in its composition, with a sandwich panel covering 50 mm thick. Given the risks posed by asbestos to public health, the proposed intervention is a priority, responding to a concern of the school community. (English)
7 July 2021
0 references
Tomar, União das freguesias de Tomar (São João Baptista) e Santa Maria dos Olivais
0 references
Identifiers
CENTRO-03-5673-FEDER-000251
0 references