Q2871092 (Q2871092): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Replacement of fibrocement coverage of the Gualdim Pais Basic School, removal of contaminated shale screens from the gutters and placement of new shale screens and execution of thermal insulation works of ceilings., translated_summary)
Property / summary
 
Replacement of fibrocement coverage of the Gualdim Pais Basic School, removal of contaminated shale screens from the gutters and placement of new shale screens and execution of thermal insulation works of ceilings. (English)
Property / summary: Replacement of fibrocement coverage of the Gualdim Pais Basic School, removal of contaminated shale screens from the gutters and placement of new shale screens and execution of thermal insulation works of ceilings. (English) / rank
 
Normal rank
Property / summary: Replacement of fibrocement coverage of the Gualdim Pais Basic School, removal of contaminated shale screens from the gutters and placement of new shale screens and execution of thermal insulation works of ceilings. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:40, 7 July 2021

Project Q2871092 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2871092 in Portugal

    Statements

    0 references
    164,649.8 Euro
    0 references
    85.0 percent
    0 references
    1 January 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE POMBAL
    0 references

    39°55'18.98"N, 8°38'12.84"W
    0 references
    Substituição da cobertura em fibrocimento da Escola Básica Gualdim Pais, remoção de telas de xisto contaminadas das caleiras e colocação de novas telas de xisto e execução de trabalhos de isolamento térmico dos tectos. (Portuguese)
    0 references
    Replacement of fibrocement coverage of the Gualdim Pais Basic School, removal of contaminated shale screens from the gutters and placement of new shale screens and execution of thermal insulation works of ceilings. (English)
    7 July 2021
    0 references
    Pombal, Pombal
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000239
    0 references