Construction work and insulation of ADAST Adamov site (Q16168): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The investor’s intention is to make energy adjustments to the building compliant with current thermal requirements and standards. Insulation of the object, including the replacement of non-conforming plates, shall be carried out, installation of new heat source including a new heating system, replacement of electrical wiring and other construction modifications leading to a reduction of the energy performance of the object., Adding English summary) |
||
Property / summary | |||
The investor’s intention is to make energy adjustments to the building compliant with current thermal requirements and standards. Insulation of the object, including the replacement of non-conforming plates, shall be carried out, installation of new heat source including a new heating system, replacement of electrical wiring and other construction modifications leading to a reduction of the energy performance of the object. (English) | |||
Property / summary: The investor’s intention is to make energy adjustments to the building compliant with current thermal requirements and standards. Insulation of the object, including the replacement of non-conforming plates, shall be carried out, installation of new heat source including a new heating system, replacement of electrical wiring and other construction modifications leading to a reduction of the energy performance of the object. (English) / rank | |||
Normal rank |
Revision as of 11:16, 25 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction work and insulation of ADAST Adamov site |
Project in Czech Republic financed by DG Regio |
Statements
4,563,729.03 Czech koruna
0 references
11,409,322.58 Czech koruna
0 references
39.9999999824705 percent
0 references
30 September 2020
0 references
Adast Engineering, s.r.o.
0 references
67904
0 references
Investorovým záměrem je provést energeticky úsporné úpravy budovy tak, aby vyhovovala současným tepelně-technickým požadavkům a normám. Dojde k zateplení objektu včetně výměny nevyhovujících otvorových výplní, instalaci nového zdroje tepla včetně nové otopné soustavy, výměně elektroinstalace spolu s osazením úsporného osvětlení a k dalším stavebním úpravám vedoucím ke snížení energetické náročnosti objektu. a. (Czech)
0 references
The investor’s intention is to make energy adjustments to the building compliant with current thermal requirements and standards. Insulation of the object, including the replacement of non-conforming plates, shall be carried out, installation of new heat source including a new heating system, replacement of electrical wiring and other construction modifications leading to a reduction of the energy performance of the object. (English)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0012966
0 references