Q2880609 (Q2880609): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Lisbon metropolitan area / rank | |||
Normal rank |
Revision as of 23:20, 6 July 2021
Project Q2880609 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2880609 in Portugal |
Statements
182,565.39 Euro
0 references
50.0 percent
0 references
3 September 2018
0 references
31 December 2019
0 references
MUNICÍPIO DA AMADORA
0 references
Implementação de medidas de melhoria de desempenho energético na EB 2, 3 José Cardoso Pires: substituição da iluminação fluorescente tubular T8, por soluções LED mais eficientes instalação de sistemas solares térmicos e de sistema solar fotovoltaico remoção da cobertura de amianto e substituição por painel sandwich instalação de sistema de monitorização do consumo de energia substituição de vãos envidraçados por soluções mais eficientes. (Portuguese)
0 references
Amadora, Mina de Água
0 references
Identifiers
LISBOA-03-1203-FEDER-000033
0 references