Q2866785 (Q2866785): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Created claim: summary (P836): Through this project we intend to expand and reequip the current infrastructure of ITeCons with a view to leveraging an interdisciplinary area aimed at the study of systems with great experimental and numerical requirements. This reinforcement of resources, geared towards the study of complex systems and risk mitigation, will enable the implementation of new unavailable services already signalled by a large number of companies., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Through this project we intend to expand and reequip the current infrastructure of ITeCons with a view to leveraging an interdisciplinary area aimed at the study of systems with great experimental and numerical requirements. This reinforcement of resources, geared towards the study of complex systems and risk mitigation, will enable the implementation of new unavailable services already signalled by a large number of companies. (English) | |||||||||||||||
Property / summary: Through this project we intend to expand and reequip the current infrastructure of ITeCons with a view to leveraging an interdisciplinary area aimed at the study of systems with great experimental and numerical requirements. This reinforcement of resources, geared towards the study of complex systems and risk mitigation, will enable the implementation of new unavailable services already signalled by a large number of companies. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Through this project we intend to expand and reequip the current infrastructure of ITeCons with a view to leveraging an interdisciplinary area aimed at the study of systems with great experimental and numerical requirements. This reinforcement of resources, geared towards the study of complex systems and risk mitigation, will enable the implementation of new unavailable services already signalled by a large number of companies. (English) / qualifier | |||||||||||||||
point in time: 6 July 2021
|
Revision as of 17:59, 6 July 2021
Project Q2866785 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2866785 in Portugal |
Statements
3,900,000.0 Euro
0 references
76.0 percent
0 references
1 July 2019
0 references
31 December 2022
0 references
ITECONS - INSTITUTO DE INVESTIGAÇÃO E DESENVOLVIMENTO TECNOLÓGICO PARA A CONSTRUÇÃO, ENERGIA, AMBIENTE E SUSTENTABILIDADE
0 references
Através do presente projeto pretende-se expandir e reequipar a atual infraestrutura do Itecons com vista à alavancagem de uma área interdisciplinar dirigida ao estudo de sistemas com grandes exigências experimentais e numéricas. Este reforço de meios, orientados para o estudo de sistemas complexos e para a mitigação de riscos, viabilizará a implementação de novos serviços indisponíveis já sinalizados por parte de um grande número de empresas. (Portuguese)
0 references
Through this project we intend to expand and reequip the current infrastructure of ITeCons with a view to leveraging an interdisciplinary area aimed at the study of systems with great experimental and numerical requirements. This reinforcement of resources, geared towards the study of complex systems and risk mitigation, will enable the implementation of new unavailable services already signalled by a large number of companies. (English)
6 July 2021
0 references
Coimbra, Santo António dos Olivais
0 references
Identifiers
CENTRO-01-0246-FEDER-000035
0 references