Upgrading of EBI de Capelas facilities (Q2854626): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Azores / rank | |||
Normal rank |
Revision as of 14:43, 6 July 2021
Project Q2854626 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Upgrading of EBI de Capelas facilities |
Project Q2854626 in Portugal |
Statements
7,914,333.72 Euro
0 references
85.0 percent
0 references
30 April 2018
0 references
20 October 2022
0 references
DIREÇÃO REGIONAL DA EDUCAÇÃO
0 references
Requalificação e beneficiação da maioria das construções e edifícios existentes no complexo escolar, aumento da sua capacidade com a construção de novos edifícios, que permitam o aumento das salas de aula normais, a criação de novas salas equipadas e preparadas para aulas práticas de algumas disciplinas específicas, que permitam reestruturar algumas das zonas existentes, tais como a cozinha e a biblioteca, dotando-as de mais espaço, de melhores c (Portuguese)
0 references
Upgrading and upgrading most of the buildings and buildings in the school complex, increasing its capacity with the construction of new buildings, allowing the increase in normal classrooms, the creation of new rooms equipped and prepared for practical classes in some specific disciplines, enabling some of the existing areas to be restructured, such as the kitchen and the library, providing them with more space, better and better. (English)
6 July 2021
0 references
Ponta Delgada
0 references
Identifiers
ACORES-10-5673-FEDER-000012
0 references