Q2854147 (Q2854147): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The project was granted according to a linear intervention line that creates a certain spatial fluidity, in a pre-existing building that had some constraints.In the development of the project, the design criteria were always very clear, since there was a strict program to comply with.In the field in question, there is a construction that will undergo further changes and adaptations to the existing legislation regulating the construction of equip...) |
||||||||||||||
Property / summary | |||||||||||||||
The project was granted according to a linear intervention line that creates a certain spatial fluidity, in a pre-existing building that had some constraints.In the development of the project, the design criteria were always very clear, since there was a strict program to comply with.In the field in question, there is a construction that will undergo further changes and adaptations to the existing legislation regulating the construction of equipment. (English) | |||||||||||||||
Property / summary: The project was granted according to a linear intervention line that creates a certain spatial fluidity, in a pre-existing building that had some constraints.In the development of the project, the design criteria were always very clear, since there was a strict program to comply with.In the field in question, there is a construction that will undergo further changes and adaptations to the existing legislation regulating the construction of equipment. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project was granted according to a linear intervention line that creates a certain spatial fluidity, in a pre-existing building that had some constraints.In the development of the project, the design criteria were always very clear, since there was a strict program to comply with.In the field in question, there is a construction that will undergo further changes and adaptations to the existing legislation regulating the construction of equipment. (English) / qualifier | |||||||||||||||
point in time: 6 July 2021
|
Revision as of 12:47, 6 July 2021
Project Q2854147 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2854147 in Portugal |
Statements
437,509.28 Euro
0 references
85.0 percent
0 references
30 July 2015
0 references
29 December 2017
0 references
VICE-PRESIDÊNCIA DO GOVERNO REGIONAL
0 references
O Projeto foi concedido segundo uma linha de intervenção linear que cria uma certa fluidez espacial, num edifício pré existente que tinha alguns condicionalismos.No desenvolvimento do projeto, os critérios de desenhos tiveram sempre muito claros, já que havia um programa rígido a cumprir.No terreno em questão, existe uma construção que irá sofrer novas alterações e adaptações à legislação em vigor regulamentadora da construção de equipamentos (Portuguese)
0 references
The project was granted according to a linear intervention line that creates a certain spatial fluidity, in a pre-existing building that had some constraints.In the development of the project, the design criteria were always very clear, since there was a strict program to comply with.In the field in question, there is a construction that will undergo further changes and adaptations to the existing legislation regulating the construction of equipment. (English)
6 July 2021
0 references
Ribeira Grande
0 references
Identifiers
ACORES-09-4842-FEDER-000013
0 references