Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs. (Q2778302): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q2826186 / rank
 
Normal rank

Revision as of 12:34, 5 July 2021

Project Q2778302 in Greece
Language Label Description Also known as
English
Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs.
Project Q2778302 in Greece

    Statements

    0 references
    46,488,000.0 Euro
    0 references
    85.0 percent
    0 references
    29 May 2020
    0 references
    31 December 2023
    0 references
    ΕΡΓΟΣΕ ΑΕ
    0 references
    0 references
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references
    Στο πλαίσιο του έργου θα υλοποιηθεί η εγκατάσταση συστήματος Σηματοδότησης - Τηλεδιοίκησης ETCS (European Train Control System) Level 1, της μονής σιδηροδρομικής γραμμής Θεσσαλονίκη - Ειδομένη, με σκοπό τη μεγιστοποίηση της ασφάλειας των επιβατικών και εμπορευματικών σιδηροδρομικών μεταφορών και τη συμμόρφωση με τις αρχές της Διαλειτουργικότητας. (Greek)
    0 references
    In the framework of the project, the installation of the ETCS (European Train Control System) Level 1, the single railway line Thessaloniki – Idomeni, will be implemented in order to maximise the safety of passenger and freight rail transport and to comply with the principles of Interoperability. (English)
    2 July 2021
    0 references

    Identifiers

    5.041.829
    0 references