Q2782261 (Q2782261): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Greece)
(‎Created claim: summary (P836): The project concerns the second phase of the segmented construction of a new highway section for the Arnea bypass to the Municipality of Aristotle, with a length of 5.2 km, with one lane per direction and an Emergency Lane (LEA) without traffic separation. The project also includes the construction of a new connecting road with the 3 km long road to Megali Panagia and the construction of 4 level traffic nodes to connect to existing roads., trans...)
Property / summary
 
The project concerns the second phase of the segmented construction of a new highway section for the Arnea bypass to the Municipality of Aristotle, with a length of 5.2 km, with one lane per direction and an Emergency Lane (LEA) without traffic separation. The project also includes the construction of a new connecting road with the 3 km long road to Megali Panagia and the construction of 4 level traffic nodes to connect to existing roads. (English)
Property / summary: The project concerns the second phase of the segmented construction of a new highway section for the Arnea bypass to the Municipality of Aristotle, with a length of 5.2 km, with one lane per direction and an Emergency Lane (LEA) without traffic separation. The project also includes the construction of a new connecting road with the 3 km long road to Megali Panagia and the construction of 4 level traffic nodes to connect to existing roads. (English) / rank
 
Normal rank
Property / summary: The project concerns the second phase of the segmented construction of a new highway section for the Arnea bypass to the Municipality of Aristotle, with a length of 5.2 km, with one lane per direction and an Emergency Lane (LEA) without traffic separation. The project also includes the construction of a new connecting road with the 3 km long road to Megali Panagia and the construction of 4 level traffic nodes to connect to existing roads. (English) / qualifier
 
point in time: 2 July 2021
Timestamp+2021-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:53, 2 July 2021

Project Q2782261 in Greece
Language Label Description Also known as
English
No label defined
Project Q2782261 in Greece

    Statements

    0 references
    6,911,633.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2022
    0 references
    ΠΕΡΙΦΕΡΕΙΑ ΚΕΝΤΡΙΚΗΣ ΜΑΚΕΔΟΝΙΑΣ (Π.Κ.Μ.)
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references
    Το έργο αφορά στην Β΄ φάση του τμηματοποιημένου έργου κατασκευής νέου οδικού τμήματος εθνικής οδού για την παράκαμψη Αρναίας στον Δήμο Αριστοτέλη, μήκους 5,2 χλμ., με μια λωρίδα ανά κατεύθυνση και Λωρίδα Έκτακτης Ανάγκης (ΛΕΑ) χωρίς διαχωρισμό κυκλοφορίας. Το έργο επίσης περιλαμβάνει την κατασκευή νέας συνδετήριας οδού με την οδό προς Μεγάλη Παναγιά μήκους 3 χλμ. και κατασκευή 4 ισόπεδων κυκλοφοριακών κόμβων για την σύνδεση με τις υφιστάμενες οδούς. (Greek)
    0 references
    The project concerns the second phase of the segmented construction of a new highway section for the Arnea bypass to the Municipality of Aristotle, with a length of 5.2 km, with one lane per direction and an Emergency Lane (LEA) without traffic separation. The project also includes the construction of a new connecting road with the 3 km long road to Megali Panagia and the construction of 4 level traffic nodes to connect to existing roads. (English)
    2 July 2021
    0 references

    Identifiers

    5.000.302
    0 references